26
5
Commissioning
flame relay output opens and the signal to close the safety shut-off valve has triggered.
The shut-off test in the relevant power range and all relevant operational modes of the fir-
ing must be carried out.
WARNING!
For each change of the position or configuration of the flame monitoring, the switch-off
time must be reverified.
5.3.2
Acceptance
NOTICE
Obligation to provide evidence
Due to the obligation to provide documentary evidence to testing authorities, for quality man-
agement systems or to clarify liability issues and so on, we urgently recommend that you doc-
ument your checks of the parameter settings. This documentary evidence can be included in
the burner's settings log.
Содержание F130I
Страница 1: ...www lamtec de Sensors and Systems for Combustion Engineering Manual Flame Monitoring Device F130I...
Страница 2: ......
Страница 40: ...39 11 Appendix Connection of several F130I Fig 11 7 Application example F130I Brahma transformer 120V...
Страница 43: ...42 11 Appendix 11 4 Declaration of Conformity...
Страница 44: ...43 11 Appendix...