50
Data
Description
9*
A xx
05
Automatic regeneration launched in volume mode (SH:02).
06
Automatic regeneration launched in volume mode (SH:02)
because maximum number of days for obligatory regeneration
has been reached.
07
-
08
Automatic regeneration launched in interval mode (SH:03).
09
Automatic regeneration launched in time clock mode (SH:04).
S xx
01
Regeneration started instantaneously by remote start.
02
Regeneration started at programmed time by remote delayed start.
Xx
Number of days elapsed since the previous regeneration.
Dnxx
Elapsed days since last signal from the meter was received.
Exxx
Percentage of water saving obtained.
Xxxx
Conductivity during phase 1.
Xxxx
Conductivity during phase 2.
T2xx
Elapsed time to read conductivity in phase 2.
Xxxx
Phase and time at which regeneration was skipped.
Xxxx
Conductivity level for which washing phase was ended.
Alxx
NOAL No alarm.
AL01 Salt quantity too low during phase 2.
AL02 Sensor reading lost during regeneration
AL03 Conductivity sensor alarm absent or disconnected.
AL04 Conductivity not properly restored after regeneration.
AL05 Hardware reset occurred during regeneration.
AL06 Regeneration stopped manually.
10 U 1-7
Average water consumption (m
3
or L) for each day (evaluated,
taking into account the previous 4 weeks).
11 rExxxxxx
Reserve for the current day in m
3
or L.
12 AAA.Y
Software version and revision.
X represents a numerical code that identifies the parameter value.