3
Model
F
G
H
310 PM/2-E
M16
270
332
310 PM/2-E
M16
270
332
30 PM/2-E
M16
320
380 ÷ 0
30 PM/2-E
M16
320
380 ÷ 0
BOILER ASSEMBLY
1 Sliding flange
2 Insulating cord
3 Insulating seal
Boiler plate
The burner is fastened by using the equipped flange (or semi-flanges). The flange slides on the draught tube
and has a suitable insulating seal placed between it and the boiler plate. Between the seal and the flange is
the insulating cord around the tube. Before locking permanently it is necessary to check the insertion length,
ensuring that the draught tube penetrates the combustion chamber for several cm beyond the edge of the
tube bundle.
Flame reversal
Flame forward
Содержание 310 PM/2-E
Страница 2: ......
Страница 16: ...16 CICLO DI FUNZIONAMENTO 310 430 PM 2 E ...
Страница 38: ...38 OPERATING CYCLE 310 430 PM 2 E ...
Страница 60: ...60 CYCLE DE FONCTIONNEMENT 310 430 PM 2 E ...
Страница 82: ...82 PROGRAMMABLAUF 310 430 PM 2 E ...
Страница 104: ...104 CICLO DE FUNCIONAMIENTO 310 430 PM 2 E ...
Страница 113: ...113 ...
Страница 114: ...114 ...
Страница 115: ......