6
2.1.1 Rack-Mounting the A36D
The A36D can be installed in most relay racks with standard EIA hole spacing. If a relay rack is needed, they are
available for purchase from La Marche. The
4D, 9E, 33, 33E, and 39
enclosures are shipped from the factory
with the necessary brackets installed for rear mounting on a relay rack
.
The rack mounting bracket for the
4D
and 39
enclosures allow for mounting on a 19” or 23” rack, and the
9E, 33, and 33E
enclosures allow for
mounting on a 23” rack.
Rack Mounting Procedure
Before installing the charger on the rack, locate the conduit entrances and assure the knockouts on the top, sides,
or bottom of the charger are accessible after the charger is rack-mounted. To rack mount the A36D, first mount
the charger onto the rack-mounting brackets using the hardware supplied. Second, install the brackets onto the
rack. Provide at minimum 6in (152mm) of air space above and below to allow for cooling.
Figure 2 –
9E Enclosure Bolt Pattern
Figure 1 -
39 Enclosure Bolt Pattern
Figure 4
– 33E Enclosure Bolt Pattern
Figure 3
– 4D Enclosure Bolt Pattern
NOTE:
All dimensions are in inches. For further A36D enclosure information, see the outline drawings online at
http://www.lamarchemfg.com/info/enclosure-drawings.html
Figure 5 -
33 Enclosure Bolt Pattern