Page
17
ALTO Access Products |
Lakeside Industries Ltd
Step 1
The dismantling procedure requires
a minimum of 2 operatives to
complete the task safely. To
start, first remove the aluminium
toeboard assembly.
Step 2
Now, relocate the uppermost
diagonal braces downwards so the
top hook is located on the same
rung as the uppermost platform.
This can be done by either using
one operative on the top platform
and one operative on the platform
underneath, or by disengaging the
top hook then climbing down onto
the platform below and disengage
the 2nd hook.
Step 3
Next, remove the 4 guardrails. To
remove braces or guardrails, first
disconnect each brace at the end
furthest away from the platform
trap door. Then immediately take
up the protected position detailed
in the 3T method. Whilst standing
through the trapdoor as per the
3T method, disconnect the braces
completely.
DISMANTLING INSTRUCTIONS - All Platform Working Heights