51
16.) Control Panel- from Controller/Electrical Cabinet
(Cont’d.):
Control Names & Definitions:
1.)
Auto/Manual Control:
Non-functional Control.
2.)
Torch Up/Torch Down Control:
This control
Jogs the Z-Axis Up and Down.
3.)
Arc Strike Push Button:
Will Fire Torch (This operation is performed commonly for test
purposes).
4.)
Zero Test Push Button:
Torch approaches downward and touches metal and raises to
IHS
height, also saves Start Point (Origin Point) of the cut.
5.)
IHS Height Control:
IHS=Initial Peirce Height
, Plasma manual will give you this number
whether it is a Hypertherm or Thermal Dynamics.
6.)
Sensitivity Control:
Controls how fast the height control reacts to the metal warping, Lower=
More Sensitive, Higher= Less sensitive.
7.)
Set Arc Voltage Menu Control:
Controls the voltage of the cut (This switch also controls the
height and the cleanliness of the cut.)
Содержание Plasma Level 2 CNC
Страница 1: ...1 Safety Maintenance Receiving Unpacking Locating New Machine Parts Operation Procedures Programming ...
Страница 31: ...31 2 2 Unloading Requirements b Pry Bar c Wire Cutters d Cordless Drill 5 Cut all straps only on the Crate ...
Страница 53: ...53 17 Basic Operations Rear Door of the Electrical Cabinet ...
Страница 71: ...71 21 Basic Operations Cont d The Main Display ...
Страница 84: ...84 23 METHODS OF SELECTING PROGRAMS Cont d Shapes in Library 1 Shapes in Library 2 ...
Страница 103: ...103 27 NESTING Cont d 4 Select the Saved File you wish to nest and press ENTER ...
Страница 110: ...110 31 PROGRAMMING Cont d PROGRAMMING CODES G Codes ...
Страница 111: ...111 31 PROGRAMMING Cont d PROGRAMMING CODES M Codes ...
Страница 113: ...113 32 MAINTENANCE Cont d Error Code List ...
Страница 115: ...115 MAINTENANCE Cont d MACHINE SETUP PARAMETERS ...
Страница 118: ...118 MAINTENANCE Cont d PROCEDURE SETTING MACHINE ZERO 6 In the parameters find DIR ORIGIN Set X 00 Y 00 ...
Страница 128: ...128 MAINTENANCE PROCEDURE UPDATING CONTROL SOFTWARE FROM USB DRIVE Cont d 9 Push F1 ...
Страница 132: ...132 FastCAM SETUP Cont d ...
Страница 133: ...133 FastCAM SETUP Cont d ...
Страница 134: ...134 FastCAM SETUP Cont d ...
Страница 135: ...135 FastCAM SETUP Cont d ...
Страница 136: ...136 FastCAM SETUP Cont d ...
Страница 137: ...137 FastCAM SETUP Cont d ...
Страница 138: ...138 FastCAM SETUP Cont d ...
Страница 139: ...139 FastCAM SETUP Cont d ...
Страница 140: ...140 FastCAM SETUP Cont d ...
Страница 141: ...141 FastCAM SETUP Cont d ...
Страница 142: ...142 FastCAM SETUP Cont d ...
Страница 143: ...143 FastCAM SETUP Cont d ...
Страница 144: ...144 FastCAM SETUP Cont d ...
Страница 145: ...145 FastCAM SETUP Cont d ...
Страница 146: ...146 FastCAM SETUP Cont d ...
Страница 147: ...147 FastCAM SETUP Cont d ...
Страница 148: ...148 FastCAM SETUP Cont d ...
Страница 149: ...149 FastCAM SETUP Cont d ...
Страница 150: ...150 FastCAM SETUP Cont d ...
Страница 154: ...154 Laguna Tools Warranty ...
Страница 156: ...156 Laguna Tools Packaging Laguna Tools BILL of LADING Example ...
Страница 158: ...158 Laguna Tools Packaging Laguna Tools RMA Example ...