![Lafayette Accu-Rise Operating System Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/lafayette/accu-rise-operating-system/accu-rise-operating-system_installation-instructions-manual_3273191006.webp)
INSTALLATION
4
Mount the Installation Brackets — Inside Mount
■
Measure 2" from each jamb for bracket location.
➤
If more than two installation brackets came with your order, space additional bracket(s)
evenly between the two end brackets and mark their location. Mount into wood
whenever possible.
■
Center the brackets on your marks, then mark the screw holes.
➤
The minimum casement depth for mounting the installation brackets is
1
/
2
". Mark both of
the winged screw holes with the shallow mounting depths.
➤
The minimum casement depth for a fully recessed mount is 2
1
/
4
" for
3
/
8
" and
3
/
4
" pleat
size; and 3" for 1
1
/
4
" pleat size. Mark the center screw hole when depth permits.
IMPORTANT:
The front edges of the brackets must be level and aligned to each other.
■
Drill the screw holes using a
3
/
32
" drill bit.
CAUTION:
Use drywall anchors when mounting into drywall.
■
Use a level to check that the mounting surface is level. Shim the brackets if necessary.
■
Attach the installation brackets using the screws provided.
Proceed to “Install the Shade” on page 8.
2"
Space Evenly
Jamb
Jamb
Space Evenly
2"
See Depth
Chart
Use Center Hole
When Depth Permits
Содержание Accu-Rise Operating System
Страница 1: ...Accu Rise Operating System Installation Instructions Parasol Cellular Shades...
Страница 15: ......
Страница 16: ...18 67IN 18 3 14...