![Lafayette Accu-Rise Operating System Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/lafayette/accu-rise-operating-system/accu-rise-operating-system_installation-instructions-manual_3273191011.webp)
INSTALLATION
9
Install the Handle(s)
Using the handle provides touch of finger ease and convenient
shade operation.
IMPORTANT:
For shades over 60" wide, two handles will be
provided. Space these handles evenly across the rail.
■
Attach the handle at the center of the bottom rail.
➤
Hook the prongs of the handle onto the lip of the
bottom rail.
➤
Rotate the handle
down
until it snaps onto the
bottom rail.
■
If your shade has a middle rail, attach the other
handle at the center of the middle rail. To identify
the middle rail, see “Product View” on page 1.
IMPORTANT:
With
Bottom-Up/Top-Down and
Day/Night shades, attach the middle rail handle
upside-down, as shown.
Level the Bottom Rail (If Necessary)
■
Lift the bottom rail to locate the pockets on the underside
of the rail.
■
Gently pull down on the bottom rail to fully insert the
7
/
64
"
Allen wrench key into the pocket. The key is fully inserted
when the ring on the key abuts to the pocket.
➤
Lift up the bottom rail slightly before turning the Allen
wrench key. Turn the key clockwise to raise that side
of the bottom rail, or counter-clockwise to lower it.
➤
One quarter turn of the key equals approximately
1
/
4
".
IMPORTANT:
The Allen wrench key must be fully
inserted to avoid stripping the mechanism. Do
not
pull
down on the bottom rail while turning the key.
■
Adjust the end pockets first. Then adjust any additional
pockets as necessary to maintain equal tension across
the bottom rail.
Handle
Middle
Rail
Front of
Shade
Bottom-Up/Top-Down
and Day/Night Shades
Handle
Bottom Rail
Underside of Bottom Rail
Allen
Wrench
Key
Lower
Raise
Содержание Accu-Rise Operating System
Страница 1: ...Accu Rise Operating System Installation Instructions Parasol Cellular Shades...
Страница 15: ......
Страница 16: ...18 67IN 18 3 14...