Lafayette Accu-Rise Operating System Скачать руководство пользователя страница 14

CARE

12

Removing the Shade (If Necessary)

 

Lower the shade approximately 4".

 

While holding the headrail, push 
back on the bottom tab of 
the installation bracket to 
release the bottom edge of 
the headrail.

 

After releasing the bottom edge, 
roll the back of the headrail down and 
out from the bracket.

Cleaning Procedures

Cellular shades are made of anti-static, dust-resistant fabric which repels dirt and dust. For 
most fabrics, the following cleaning options are available.

Dusting

 

Regular light dusting with a feather duster is all the cleaning that is needed in most 
circumstances.

Vacuuming

CAUTION:  

Do not vacuum XXX fabrics.

 

For deeper cleaning, vacuum gently with a brush attachment.

Other cleaning methods described in the branded IOCs include:

Compressed Air/Hair Dryer (Cool Setting)

Spot-Cleaning

Bathtub Cleaning/Water Immersion

Ultrasonic Cleaning

Injection/Extraction Cleaning

Bottom 

Tab

Back of 

Shade

Headrail

Bracket

Содержание Accu-Rise Operating System

Страница 1: ...Accu Rise Operating System Installation Instructions Parasol Cellular Shades...

Страница 2: ...rackets Inside Mount 4 Mount the Installation Brackets Outside Mount 5 Mount the Installation Brackets End Mount 7 Install the Shade 8 Attach Hold Down Brackets Optional 8 Install the Handle s 9 Level...

Страница 3: ...GETTING STARTED 1 Product View Middle Rail Bottom Rail Installation Brackets Handle Headrail Not Shown Bottom Up Top Down Shade Standard Bottom Up Shade Day Night Shade...

Страница 4: ...mounting surface s 6 Hex Head Screws Provided Two 11 2 screws are provided per installation bracket Longer 6 Hex Head Screws Not Provided If using spacer blocks use 6 screws long enough for a secure...

Страница 5: ...the installation process follows very easily To prepare for this important first step review the mounting types and basic window terminology illustrated below Refer to the appropriate page below based...

Страница 6: ...s with the shallow mounting depths The minimum casement depth for a fully recessed mount is 21 4 for 3 8 and 3 4 pleat size and 3 for 11 4 pleat size Mark the center screw hole when depth permits IMPO...

Страница 7: ...cation Mount into wood whenever possible Center the installation brackets on your marks and mark where to drill the screw holes A minimum flat vertical surface of 11 4 for installation brackets or ext...

Страница 8: ...lock installation bracket to a flat vertical mounting surface with a 6 mounting screw long enough for a secure installation A maximum of 11 2 of spacer blocks per installation bracket is recommended T...

Страница 9: ...nting depth is 11 4 for 3 4 and 3 8 pleat sizes Minimum mounting depth for a fully recessed end mount is 23 8 for 3 4 and 3 8 pleat sizes Minimum mounting depth is 2 for 11 4 pleat size Mininum mounti...

Страница 10: ...If Necessary on page 12 Attach Hold Down Brackets Optional Hold down brackets provide stability and prevent swaying by securing the bottom rail often used in French door applications Hold down bracke...

Страница 11: ...Lift the bottom rail to locate the pockets on the underside of the rail Gently pull down on the bottom rail to fully insert the 7 64 Allen wrench key into the pocket The key is fully inserted when the...

Страница 12: ...Bottom Up Top Down and Day Night Shades Shades with the Bottom Up Top Down and Day Night design options have two moving rails You can operate these shades as described in this section With the bottom...

Страница 13: ...aligned Shim the installation brackets to level the headrail if necessary Check to see if there is an obstruction in the shade s path If a shade hits an obstruction as it is lowered it may become mis...

Страница 14: ...resistant fabric which repels dirt and dust For most fabrics the following cleaning options are available Dusting Regular light dusting with a feather duster is all the cleaning that is needed in most...

Страница 15: ......

Страница 16: ...18 67IN 18 3 14...

Отзывы: