50 General Maintenance
There are 8 bolts on each side of the trolley (see Figure 3
30).
Figure 3
-
30 Removing the central trolley
3.
Proceed with the replacement of the worn trolley.
4.
Screw the new trolley onto the central tunnel using the same bolts.
5.
Once the replacement is done, reinstall the packer inside the body using an appropriate lifting
device (see
Reinstalling the Packer on page 55).
6.
Run the packer for a few cycles to make sure the new trolley has been properly installed.
Replacing the T-Track
With the packer cycling back and forth more than a thousand times each day, the T-Track may show
some signs of excessive wear. These may include but are not limited to bent, torn or scratched. In
such a situation, the replacement of the T-Track is required for optimum performance of the packer.
It will help the packer to move more smoothly with less sideway and/or up-and-down motions.
To replace the T-Track, do the following:
1.
Remove the packer from the body. See
Removing the Packer on page 45.
2.
Remove the T-Track. To do so:
2 a.
Using a grinder or cutting tool, cut all the stitch welds that hold the T-Track to its base.
2 b.
Remove the T-Track.
Be careful when handling the T-Track out of the body.
2 c.
Clean the hopper floor and wall surfaces.
3.
Install the new T-Track on the T-Track base.
Warning!
When reinstalling the packer always ensure total clearance to avoid any accidents.
Bolts to be removed -
8 on each side
Содержание AUTOMIZER FULL EJECT
Страница 1: ...AUTOMIZERTM FULL EJECT MAINTENANCE MANUAL ...
Страница 2: ......
Страница 3: ...AUTOMIZERTM FULL EJECT MAINTENANCE MANUAL ...
Страница 36: ...28 Safety ...
Страница 112: ...104 Lubrication ...
Страница 136: ...128 Hydraulic System Figure 5 18 Filler cap Figure 5 19 Oil temp level gauge Figure 5 20 Steel hydraulic tank ...
Страница 139: ...Hydraulic System 131 Figure 5 23 Strainer assembly Strainer ...
Страница 144: ...136 Hydraulic System Figure 5 27 Detecting cylinder internal leaks 1 2 3 4 5 A A A ...
Страница 159: ...Hydraulic System 151 Main Hydraulic Schematics 0 1 2345 62789 ELECTRO HYDRAULIC VALVE STD RH ARM ...
Страница 160: ...152 Hydraulic System 0 1 2345 62789 ELECTRO HYDRAULIC VALVE HD RH ARM ...
Страница 161: ...Hydraulic System 153 0 1 2345 62789 ELECTRO HYDRAULIC VALVE CRUSHER PANEL HD RH ARM ...
Страница 162: ...154 Hydraulic System 0 1 2345 62789 ELECTRO HYDRAULIC VALVE HD 300 GAL RH ARM DUAL PRESSURE GRIPPER ...
Страница 163: ...Hydraulic System 155 0 1 2 3456 7389 0 ELECTRO HYDRAULIC VALVE CRUSHER PANEL HD 300 GAL RH ARM ...
Страница 164: ...156 Hydraulic System ...
Страница 176: ...168 Electric System Cab Console Control Wiring ...
Страница 177: ...Electric System 169 Control Box ...
Страница 178: ...170 Electric System Chassis ...
Страница 179: ...Electric System 171 Tailgate Lighting ...
Страница 180: ...172 Electric System Left Body SideWiring ...
Страница 181: ...Electric System 173 Right Body Side Wiring ...
Страница 182: ...174 Electric System Camera s Switchpack s Layout Option s AUTO 10 SEC INHIBIT AUTO ...
Страница 204: ...196 Troubleshooting ...
Страница 205: ...Troubleshooting 197 ...
Страница 206: ...198 Troubleshooting ...
Страница 230: ...222 Multiplexing ...
Страница 232: ...224 Lifting Arm Figure 10 1 Mounting bolts Figure 10 2 Rollers and bearings Figure 10 3 Bolt locks Bearing Roller ...
Страница 252: ...244 Lifting Arm Figure 10 24 Cadmium plated clamping screws Figure 10 25 Tightening screws in a continuous sequence ...
Страница 254: ...246 Lifting Arm Figure 10 27 Standard lifting arm ...
Страница 255: ...Lifting Arm 247 ...
Страница 256: ...248 Lifting Arm ...