220 Multiplexing
Programmed Parameters
N
OTE
:
The following tables show parameters that are not necessarily specific to your vehicle. These
are general parameters. To obtain the parameters that are closely related to your vehicle,
contact LabriePlus and ask for the electrical schematic pertaining to your truck model with all
the options installed.
Programming the TCM affects the engine speed, the
PTO
engagement and operation as well as the
(optional) auto-neutral system. If the TCM is replaced, the new TCM must be reprogrammed to
reset the vehicle operating parameters. Refer to Table 5 to reprogram the new TCM.
On chassis supplied by Labrie, the programming package for Allison transmissions is package no 142.
Some customer chassis may have different programming packages. Refer to your local Allison dealer
for original programming packages. For further information regarding TCM programming, contact
Labrie
Plus.
This page and the next page show how Allison TCMs are programmed for Labrie vehicles.
N
OTE
:
The parameters shown in the following tables are typical values and are given for guidance
only. Some vehicles may need different parameters based on the options installed. Please call
LabriePlus for the values that are specific to your vehicle.
N
OTE
:
Engine speed (rpm) or road speed (mph) limiters are options.
Table 5
Allison transmission programmed parameters
Parameters (PTO Enable)
RPM
PTO Drive Interface 1: Maximum Engine Speed for Engagement
900
PTO Drive Interface 1: Maximum Engine Speed for Operation
4000
PTO Drive Interface 1: Maximum Output Speed for Engagement
5000
PTO Drive Interface 1: Maximum Output Speed for Operation
5000
Table 6
Allison wires to be enabled
Wires
Wire # (WTEC IV)
Pack enable
117
Input
PTO
enable
143
Output
PTO
enable
130
Output neutral indicator – PTO
145
Auto-neutral pack enable (if present)
142
Содержание AUTOMIZER FULL EJECT
Страница 1: ...AUTOMIZERTM FULL EJECT MAINTENANCE MANUAL ...
Страница 2: ......
Страница 3: ...AUTOMIZERTM FULL EJECT MAINTENANCE MANUAL ...
Страница 36: ...28 Safety ...
Страница 112: ...104 Lubrication ...
Страница 136: ...128 Hydraulic System Figure 5 18 Filler cap Figure 5 19 Oil temp level gauge Figure 5 20 Steel hydraulic tank ...
Страница 139: ...Hydraulic System 131 Figure 5 23 Strainer assembly Strainer ...
Страница 144: ...136 Hydraulic System Figure 5 27 Detecting cylinder internal leaks 1 2 3 4 5 A A A ...
Страница 159: ...Hydraulic System 151 Main Hydraulic Schematics 0 1 2345 62789 ELECTRO HYDRAULIC VALVE STD RH ARM ...
Страница 160: ...152 Hydraulic System 0 1 2345 62789 ELECTRO HYDRAULIC VALVE HD RH ARM ...
Страница 161: ...Hydraulic System 153 0 1 2345 62789 ELECTRO HYDRAULIC VALVE CRUSHER PANEL HD RH ARM ...
Страница 162: ...154 Hydraulic System 0 1 2345 62789 ELECTRO HYDRAULIC VALVE HD 300 GAL RH ARM DUAL PRESSURE GRIPPER ...
Страница 163: ...Hydraulic System 155 0 1 2 3456 7389 0 ELECTRO HYDRAULIC VALVE CRUSHER PANEL HD 300 GAL RH ARM ...
Страница 164: ...156 Hydraulic System ...
Страница 176: ...168 Electric System Cab Console Control Wiring ...
Страница 177: ...Electric System 169 Control Box ...
Страница 178: ...170 Electric System Chassis ...
Страница 179: ...Electric System 171 Tailgate Lighting ...
Страница 180: ...172 Electric System Left Body SideWiring ...
Страница 181: ...Electric System 173 Right Body Side Wiring ...
Страница 182: ...174 Electric System Camera s Switchpack s Layout Option s AUTO 10 SEC INHIBIT AUTO ...
Страница 204: ...196 Troubleshooting ...
Страница 205: ...Troubleshooting 197 ...
Страница 206: ...198 Troubleshooting ...
Страница 230: ...222 Multiplexing ...
Страница 232: ...224 Lifting Arm Figure 10 1 Mounting bolts Figure 10 2 Rollers and bearings Figure 10 3 Bolt locks Bearing Roller ...
Страница 252: ...244 Lifting Arm Figure 10 24 Cadmium plated clamping screws Figure 10 25 Tightening screws in a continuous sequence ...
Страница 254: ...246 Lifting Arm Figure 10 27 Standard lifting arm ...
Страница 255: ...Lifting Arm 247 ...
Страница 256: ...248 Lifting Arm ...