10
Chin Rest
Wire
Base Lamp
Wire
Figure- 8 Connections
Figure- 6 Illumination & Moving Arm Assembly
Figure- 5 Install Base
Figure. 7 Assembling Power Supply on the
Power Supply Bracket
Move
Handles
up or
down
Allen Cap
Screw
Figure- 9 Adjusting Patient
Handle Height
Figure- 7 a. Earthing wire attaching
screw
SL 20i
SETUP (continued)
8126700-795
SL 20i
Issue 1.0
Printed on June,2019
UNPACKING AND INSTALLATION (continued)
7. Install the Slit Lamp Base Assembly onto the track
of the Table Top and slide the Guide Rail Covers
around the tracks. Refer to Figure-5. Lock the base
at any position to prevent any undesired movement
by using Base Locking Knob Shown as (A) in Fig. 5.
8. Assemble Illumination & moving arm assembly
onto the base using Allen Screw M6 as shown in
Figure.6.
9. Assemble Power Supply to the table top just by
pushing into the hole shown as (C), refer Figure-7.
10.Connect the power supply earthing wire with table
top at point “D”and “E”using 3mm Allen Wrench.
Refer Figure-7&7a.
11.Attach the Base Lamp Wire Connector to the back
of the Power Supply Assembly. Refer to Figure-8.
12.Connect the Chin rest target light Connector to the
Power Supply Assembly by plugging it in. Refer to
Figure-8.
13. Using the 3mm Hex Wrench, Assemble the Patient
Handles to the Platform Assembly as shown in
Figure.9.
C
D
E
Slide
A