![La Spaziale S 3 Скачать руководство пользователя страница 7](http://html2.mh-extra.com/html/la-spaziale/s-3/s-3_manual-for-use-and-maintenance_3129143007.webp)
MANUAL FOR USE AND MAINTENANCE
LSC 001 -UK- REV. 06
7
STARTING UP AND PROGRAMMING THE APPLIANCE
(Range New - Rapid - Spazio - S3 EP/EK - S5 – Compact models)
FOLLOW THE INSTRUCTIONS BELOW (REFERRING TO THE LIST OF PARTS ON PAGES 27/34.
2.1
STARTING UP
FILLING THE BOILER
a) Open the water supply tap as fitted during the preparatory stages (2 - Pict.1 - page 6).
b) Make sure that on the pressure gauge of the motor-driven pump (17) you can read the water mains
pressure ( approx. 4 bar).
c) Push the manual filling valve on the appliance (1) until the boiler level indicator is halfway (2).
In
group 1 - Compact models and on models from the Rapid - Spazio range fitted with additional steam
wand, to have access to this tap, it is necessary to remove the drip tray (9). The closing of this tap is
manual.
SWITCHING ON THE APPLIANCE
Turn on the main switch (1 - Pict.1 - page 6), as described for the preparation of the system, then turn on
the appliance switch (3) setting it to
ON/1 and making sure that the electric connection control light (22),
where present, switches on.
For the
S5 range, when the appliance is switched on, the electronic part carries out a check; all symbols on
the control panel are switched on from left to right. At the end of this stage, the symbol for the temperature
setting will start to flash to indicate that the appliance is heating up.
NOTE. According to the amount of water filled manually, it is possible to use the automatic refill
system when the switch (3) is turned on, until the boiler water level indicated by the manufacturer
is reached.
ELECTRIC SWITCHING ON AND BOILER WATER REFILL
In the
S5 1 GROUP range, in order to refill the boiler with water , turn on the main switch as arranged
in the preparatory stages ( 1-Pict 1- page 6) ,then open the water supply tap ( 2- Pict 1 page 6 ) making
sure that the water mains pressure is visualized ( approx 4 bar ) on the pressure gauge of the motor-pump
( 17).
Turn the switch knob of the machine to position 1, the LEDS on the touchpad switch on , indicating that
the machine is connected to power , the boiler water refill sets in motion automatically until the boiler water
level indicated by the manufacturer is reached.
ONLY FOR EQUIPMENT FITTED TO OPERATE WITH GAS (optional)
a) Open the gas tap mentioned in the preparation of the system (4 - Pict.1 - page 6).
b) Turn the knob (30) on the machine by 90° until the symbol of the large flame on the knob itself is at the
top.
c) Push the knob (30) and the gas igniter (31) at the same time until the gas turns on; this can be seen
through the inspection opening (41).
d) Hold down the knob (30) for about 10 seconds and check through the special inspection opening (41),
that the flame stays lit.
e) It is recommended to turn the gas adjustment knob (30) to the small flame setting during summer to
prevent useless overheating of the coffee cups on the top grid of the machine (14).
2