L.B. White Tradesman 400 Скачать руководство пользователя страница 9

Assemble handle to four holes at barrel top as shown
in Fig. 1.  Tighten screws securely.

FIG. 1

HANDLE ASSEMBLY

8

13. The heater must be installed so as not to interfere

with or obstruct normal exits, emergency exits, doors
and walkways.

14.

Railing, fencing or suitable substitute materials must
be used to keep the heating equipment from any
people using and visiting the structure.

15 . Eventually, like all electrical/mechanical devices, the

thermostat can fail.  Thermostat failure may result in
an underheating condition.  The thermostat should be
tested to make sure it turns the heater on and off
within a temperature differential of ±3°F.

16. Take time to understand how to operate and maintain

the heater by using this Owner’s Manual.  Make sure
you know how to shut off the gas supply to the
building and also to the individual heater.  Contact
your fuel gas supplier if you have any questions.

17.

Any defects found in performing any of the service or
maintenance procedures must be eliminated and
defective parts replaced immediately.  The heater
must be retested by properly qualified ser vice
personnel before placing the heater back into use.

PROPANE GAS SUPPLY SIZING

The vaporization of propane is affected by several factors:
the sur face area of the container, the liquid level of
propane, temperature surrounding the container, and the
relative humidity.  All of these factors are specific to a site.
Therefore, a degree of experience and judgement is
required to select the proper propane supply.

Although experience is the best guide, the following
recommendations can be used as a starting point.  The
table is based on experience in northern climates where
cold weather and high humidity are prevalent in the winter.
If more or less favorable conditions prevail at a specific site,
adjustments can be made on the basis of experience.

Recommended Gas Supply

Propane Supply Tank:

Heater(s)/Container(s):

500 gallon

1 heater per tank

1,000 gallon

2 heaters per tank

If more than one gas supply container is used per heater,
the containers must be manifolded together to allow vapor
withdrawal simultaneously from multiple containers.
Manifold system shall be in accordance with NFPA 58.

Содержание Tradesman 400

Страница 1: ...hite com ATTENTION ALL USERS This heater has been tested and evaluated by C S A International in accordance with the requirements of Standard ANSI Z83 7 CSA 2 14 and is listed and approved as a direct...

Страница 2: ......

Страница 3: ...d to property damage personal injury or loss of life GENERAL HAZARD WARNING Failure to comply with the precautions and instructions provided with this heater can result in Death Serious bodily injury...

Страница 4: ...s Owner s Manual includes all options and accessories commonly used on this heater When calling for technical service assistance or for other specific information always have model number configuratio...

Страница 5: ...Gas 6 ft 1 83 m SPECIFICATIONS Model Electrical Supply Volts Hz Phase Amp Draw Dimensions Inches L x W x H Minimum Safe Distances From Nearest Combustible Materials STARTING CONTINUOUS OPERATION Fuel...

Страница 6: ...nder some circumstances If there is an underground leak the movement of gas through the soil can filter the odorant Propane gas odor may differ in intensity at different levels Since propane gas is he...

Страница 7: ...Forced air heaters shall not be directed toward any propane gas container within 20 feet 6 10 meters Do not wash the heater Use only compressed air a soft brush or dry cloth to clean the interior of t...

Страница 8: ...nd clear while the main burner ignites to prevent injury caused from hidden leaks that could cause flashback With the main burner in operation check all connections hose connections fittings and joint...

Страница 9: ...and defective parts replaced immediately The heater must be retested by properly qualified service personnel before placing the heater back into use PROPANE GAS SUPPLY SIZING The vaporization of prop...

Страница 10: ...nsert POL stem into the valve on the tank Thread the nut counterclockwise into the tank valve Tighten the nut securely with a wrench See Fig 4 2 Slowly open the tank valve This will prevent lock up of...

Страница 11: ...urer s recommended burner manifold pressure for size orifice used Ensure that the primary air supply to heater is open and free of dust dirt and debris for complete proper combustion If the heater is...

Страница 12: ...no cost A nominal charge will be applied for wiring diagrams Maintenance Instructions 1 Before cleaning shut off all gas supply valves and disconnect electrical supply 2 The heater should have dirt or...

Страница 13: ...check for gas leaks 9 Clean the heater s orifice with compressed air or a soft dry rag Do not use files drills broaches etc to clean the orifice Doing so may enlarge the hole causing combustion or ign...

Страница 14: ...contacts of the switch opening 3 Allow the switch to cool The switch contacts will close Check for electrical continuity across the switch terminals to ensure contacts have closed FIG 10 AUTO RESET B...

Страница 15: ...UT BOWED RETAINING CLIP SMALLER HOLE ALIGNED TO IGNITER GAP MAINTENANCE 1 Using a small wire brush reach down the barrel of the heater and brush the igniter electrode Ensure buildup is removed 2 Test...

Страница 16: ...rom heater FIG 19 THERMOSTAT IGNITION CONTROL 14 15 1 Disconnect the LED wire harness from the circuit board if applicable 2 Disconnect the ignition cable and remove the nuts securing the control to t...

Страница 17: ...and start the heater FIG 22 C Reading Pressures 1 With the heater operating the pressure gauge must read the pressures specified on the dataplate 2 Does the reading at the gas control valve agree wit...

Страница 18: ...Lights But Does Not Stay Lit 24 Components should be replaced only after each step has been completed and replacement is suggested in the flow chart Refer to the Servicing sections as necessary to obt...

Страница 19: ...voltage supplied to heater power cord Check extension cords and circuit breakers Repair extension cord reset breaker or call qualified electrician No 18 Problem Defective ignition control Does thermos...

Страница 20: ...and closed positions Yes If air proving switch is bypassed remove the bypass and retest Replace the switch if necessary One Time Air proving switch contacts are closed before fan motor starts Is air...

Страница 21: ...gnition control Defective motor Does ignition control send voltage to air proving switch Is ignition control receiving proper voltage No Is proper voltage supplied to heater power cord Defective ignit...

Страница 22: ...ernal board fault If module resets then have qualified electrician check power source for power quality problems Frequency line noise line spikes loose connections too small wire gauge Flame sense rel...

Страница 23: ...ed to ignition control Defective thermostat Is voltage supplied to air proving switch from the ignition control Defective Ignition Control Does fan motor start Check for voltage from ignition control...

Страница 24: ...rk Is high voltage lead securely connected to ignition control and ignitor Connect high voltage lead Is ignitor properly gapped Check igniter gap Regap to 3 16 in Is ignitor gap positioned toward burn...

Страница 25: ...iter if needed No Connect high voltage lead 24 TRADESMAN HEATER Problem Is proper fuel supplied to heater inlet Connect proper gas supply to heater Open all gas shutoff valves No Is proper gas pressur...

Страница 26: ...Electrical Connection and Ladder Diagrams 25 TRADESMAN 400 TRADESMAN 400 ULTRA...

Страница 27: ...fresh air into the heater and blow it into room for heating Gas Control Solenoid Valve House an electromagnet which is energized by voltage and opens to allow passage of gas to the burner orifice Gas...

Страница 28: ...27 PARTS SCHEMATIC Parts Identification...

Страница 29: ...ve 572551 14 Manifold tube with fittings 572570 15 Ignition control 571344 16 Ignition cable high voltage 571263 17 Igniter 573196 18 Backflash switch with hardware 572571 19 Combustion chamber with b...

Страница 30: ...nths of the date code marked on the part If the defect occurs more than 24 months later than the date code but within 24 months from the date of purchase by the end user a copy of a bill of sale will...

Отзывы: