K2 WST
®
enclosure
RIGGING MANUAL
VERSION 1.0
K2_RM_EN_1.0
w w w . l - a c o u s t i c s . c o m
2 2 / 52
4.
Turn the K2 enclosure upside down, lower it and secure it on the other K2.
Secure the front and rear rigging arm to the lower K2 enclosure.
Secure the front and rear rigging arm to the K2-BUMP.
Slide the front rigging arm up and down to align the holes.
Secure the front rigging arm to the top enclosure.
Raise the top enclosure to align the holes.
Push the locking system button to unblock the lock.
5.
Repeat steps 3 to 5 until the line is complete.