K2_RM_EN_0.5
w w w . l - a c o u s t i c s . c o m
1 7 / 52
5
SUBSET PROCEDURES
Preparing a block of 4 K2
PROCEDURE A.
1.
Attach a K2 enclosure on K2-CHARIOT.
Fully rotate the rear rigging arms of the K2-CHARIOT.
Position the K2 enclosure on the K2-CHARIOT dolly
Secure the enclosure at the front using the
LINK
hole
.
Lift the rear of the enclosure and rotate the dolly rear
rigging arm in its upward position.
Secure the enclosure using the
LINK
hole
.