Rigging procedures
Securing LA-RAK II AVB on LA-RAKMOUNT
Type of deployment
own array
Rigging accessories
LA-RAKMOUNT (2 rails for 1 LA-RAK II AVB
)
8 M8×30 screws (provided with LA-RAKMOUNT)
K3-BUMP
LA-RAK II AVB
Additional accessories
electric screwdriver with torque selector
Min number of operators
2
Procedure
1.
Position and secure the two rails on the K3-BUMP.
Use the electric screwdriver. Set the torque to 5 N.m. Before securing the side rails, make sure the frame pins are on
the outside.
T30
5 N.m
*
The following procedure is also applicable for previous LA-RAK products.
80
K3 owner's manual (EN) version 1.0