Rigging procedures
Adding a pullback with K3-RIGBAR
Type of deployment
own array
Rigging accessory
K3-RIGBAR
2 × Ø19 mm shackles WLL 3.25 t (provided)
Min number of operators
2
Pickup points must be aligned with the linking points.
under K3-RIGBAR
under K3-BAR
Procedure
Optionally, secure another K3-RIGBAR on the top enclosure to replace K3-BUMP as the main lifting accessory.
1.
Prepare an array of K3. Refer to
Flying an array with K3-BUMP and K3-BAR
(p.67).
2.
Raise the array.
3.
Secure the LA-SLING2T to the second motor hook.
Make sure the chains are not twisted.
4.
Attach K3-RIGBAR to the sling using the two 3.25 t WLL shackles.
Use the interior holes of the bar.
The external holes are dedicated to additional safety.
K3 owner's manual (EN) version 1.0
73