After pipe construction is completed, you must check for leaks.
y
If unit is connected to the pipe and the pipe is not completely full of water, this may
cause the pump to rotate without operating normally, overheating the pump or
inducing malfunctions. Thus, make sure to remove the air inside the pipes and check
the water level.
y
Pipes must be completely insulated.
y
Please do necessary measures to ensure freezing guard in locations where it is
extremely cold such as covering the exposed pipes with insulation heater(It is also
proper to insulate by constructing the pipes next to the heating pipes).
y
If any freezing may occur, condensed water discharge hose must be completely
insulated with insulation material.
y
When not using the boiler for a long time, completely drain the unit of water to
prevent freezing and close the gas shut-off valve and unplug the unit.
y
The exposed parts must be protected from freezing by covering with at lease 25mm
of insulation material(Colder locations it should be at least 50mm).
<General Cautionary Items in Pipe Construction>
y
Each connection part must be tightened with union or nut.
y
Water supply pipe, hot water pipe, heating pipe, distributor, and check valve must
be insulated to prevent freezing.
y
Pipe materials must be national or local standard materials.
y
Before connecting the heating and hot water pipes to the boiler joint, please
remove any iron shavings that were produced during the pipe construction or any
contaminants inside the pipes(Complete Cleaning of the Pipes).
y
Please do not use any well water for heating. If it is unavoidable that you must use
hard water then please remove any contaminants from the pipes.
y
Do not connect to the pipes (particularly the metal pipes) that were used for coal or
oil boilers if at all possible (This may cause malfunction or shorten its use life). If
unavoidable, please remove any contaminants from the pipes.
y
Any contaminants inside the pipes reduce heating and hot water efficiency and
causes malfunctions.
y
Please completely remove any air from each of the pipes.
Recommendations
Freezing Guard
Содержание KDB-131GOM
Страница 8: ...G O M 영 문 38 Boiler Size and Function Guide KDB 131 161 201GOM KDB 251GOM BOILER SCHEMATIC 3 ...
Страница 35: ...G O M 영 문 65 Wiring Diagram 9 Wiring Connecting Diagram ...
Страница 36: ...G O M 영 문 66 Display Interface 10 s burner is switched on ...
Страница 50: ...G O M 영 문 80 MEMO ...