![KyungDong KDB-131GOM Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/kyungdong/kdb-131gom/kdb-131gom_installation-manual_2018093011.webp)
G O M - 영 문
41
y
All pipes should be inspected for leaks after assembly is completed to prevent any
defects or leaks.
y
All pipes other than the gas pipes should be insulated for prevention against freezing
after assembly is completed.
y
When connecting the pipes, after fixing the connections using the spanner, etc,
connect it to the pipes.
y
Distributor Specifications
- Less than 5 holes
: Inner diameter of over 36mm
- Over 6 holes
: Inner diameter of over 44mm
y
Distributor material
- Please use non-Corrosive material
- Do not use aluminum, carbon steel pipes, cast iron materials since they are easily
corroded.
y
Gas Meter Specifications
- 20,000
kcal/h or less : Over 3
level
- 25,000kcal/h
: Over 5
level
Standard Piping Diagram
Содержание KDB-131GOM
Страница 8: ...G O M 영 문 38 Boiler Size and Function Guide KDB 131 161 201GOM KDB 251GOM BOILER SCHEMATIC 3 ...
Страница 35: ...G O M 영 문 65 Wiring Diagram 9 Wiring Connecting Diagram ...
Страница 36: ...G O M 영 문 66 Display Interface 10 s burner is switched on ...
Страница 50: ...G O M 영 문 80 MEMO ...