2BC/D
1-3-27
15. Open the right cover. Attach the retaining rail
to the copier with the V-groove of the rail
aligned with the center of the scale located at
the base of the copier, using the two M4
×
6
TP-A chromate screws.
16. When the side deck is installed on the copier,
connect the deck signal cable to the
connector on the copier rear.
Figure 1-3-57
Figure 1-3-58
Scale
Center
Retaining rail
M4
×
6 TP-A chromate screws
V-groove
Deck signal cable
Connector
Содержание Ri 4530 Copystar
Страница 1: ...SERVICE MANUAL Published in Feb 02 2BC70941 Revision 1 Ri 4530 5530 ...
Страница 76: ...2BC D 1 1 4 13 This page is intentionally left blank ...
Страница 100: ...1 4 35 2BC D 1 This page is intentionally left blank ...
Страница 142: ...2BC D 1 This page is intentionally left blank ...
Страница 173: ...2BC D 1 This page is intentionally left blank ...
Страница 187: ...2BC D 1 1 5 42 This page is intentionally left blank ...
Страница 355: ...2BC D 2 3 20 CN1 CN7 CN5 3 1 1 6 CN2 1 6 CN6 3 1 CN4 1 1 6 16 Figure 2 3 8 Scanner drive PCB silk screen diagram ...
Страница 374: ...2BC D 1 2 4 16 This page is intentionally left blank ...
Страница 380: ...2BC D 1 2 4 22 This page is intentionally left blank ...