2J5
1-5-20
(4) Detaching and refitting the press roller
Procedure
1. Remove the fuser unit (See page P.1-5-16).
2. Open the fuser unit (See page P.1-5-17).
3. Remove the press roller from the fuser lower
frame.
4. Remove two bearings.
5. Check or replace the press roller and refit all
the removed parts.
Figure 1-5-27
Press roller
Fuser lower frame
Bearing
Bearing
Содержание Ecosys FS-6970DN
Страница 1: ...SERVICE MANUAL Published in March 2009 842J5110 2J5SM060 First Edition FS 6970DN...
Страница 3: ...Revision history Revision Date Replaced pages Remarks...
Страница 4: ...This page is intentionally left blank...
Страница 10: ...This page is intentionally left blank...
Страница 18: ...2J5 1 1 6 This page is intentionally left blank...
Страница 24: ...2J5 1 2 6 This page is intentionally left blank...
Страница 40: ...2J5 1 3 16 This page is intentionally left blank...
Страница 120: ...2J5 2 3 8 This page is intentionally left blank...
Страница 124: ...2J5 2 4 4 This page is intentionally left blank...
Страница 125: ......
Страница 126: ......