2HA/2HB
1-2-7
1-2-4
Installing the drawer heater (option)
Drawer heater installation requires the following parts:
Drawer heater (P/N 120 V specifications: 2C960030, 220-240 V specifications: 2C960040)
One (1) M4 x 10 tap-tight S binding screw (P/N BAB54100)
<Procedure>
1. Remove the right cover.
2. Pull out the drawer.
3. Remove the three screws and then the front
right cover.
Figure 1-2-7
Front right cover
Содержание Copystar CS-1635
Страница 1: ...SERVICE MANUAL Published in July 06 2HB70942 Revision 2 CS 2035 CS 1635 ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ......
Страница 14: ...2HA 2HB This page is intentionally left blank ...
Страница 20: ...2HA 2HB 1 1 6 This page is intentionally left blank ...
Страница 126: ...2HA 2HB 1 4 30 This page is intentionally left blank ...
Страница 162: ...2HA 2HB 1 5 36 This page is intentionally left blank ...
Страница 180: ...2HA 2HB 2 1 16 This page is intentionally left blank ...
Страница 210: ...2HA 2HB 2 4 8 ...
Страница 214: ...INSTALLATION GUIDE FOR THE 300 SHEET CASSETTE ...
Страница 221: ...INSTALLATION GUIDE FOR THE DOCUMENT PROCESSOR ...
Страница 232: ...INSTALLATION GUIDE FOR THE DUPLEX UNIT ...
Страница 240: ...INSTALLATION GUIDE FOR THE Printing System X ...
Страница 243: ......
Страница 244: ......