
2FD/2FF/2FG
1-3-59
7. Align the rail retainer with the groove of the
guide rail and attach the rail retainer to the
guide rail. Make sure that the plate spring of
the rail retainer fits into the groove and the
edge of the guide rail fits between the pulleys
on the reverse side of the rail retainer.
8. Orient the guide rail such that its pulley is
positioned toward the copier.
9. Secure the rail retainer to the copier using
two M4
×
10 binding screws such that the
front and the rear gaps between the floor and
the rail retainer are approximately 10 mm.
Figure 1-3-139
Figure 1-3-140
Figure 1-3-141
Guide rail
Rail retainer
Plate spring
Rail retainer
Pullery
Guide rail
10 mm
10 mm
Rail retainer
Rail retainer
M4
×
10
binding screws
Содержание AD-63
Страница 340: ...AD 63...
Страница 343: ...3CX 1 1 2 1 1 2 Part names Figure 1 1 1 Duplex unit...
Страница 344: ...3CX 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path Duplex unit...
Страница 360: ...DF 78...
Страница 363: ...3B5 1 1 2 1 1 2 Part names Figure 1 1 1 1 Intermediate tray 2 JAM release lever 3 Eject tray...
Страница 397: ...J 1402...
Страница 400: ...3B6 1 1 2 1 1 2 Part names Figure 1 1 1 1 Job separator tray 2 LED...
Страница 401: ...3B6 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path...
Страница 402: ...3B6 1 1 4 1 1 4 Drive system Figure 1 1 3 1 Gear 20 2 Gear 28 3 Gear 28 4 Eject roller gear...
Страница 413: ...PF 70...
Страница 415: ...1 1 2 3CC 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Страница 417: ...3CC 1 1 2 1 1 2 Parts names 1 Upper drawer 2 Lower drawer 3 Desk left cover Figure 1 1 1 3 1 2...
Страница 418: ...3CC 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 2 Machine cross section...
Страница 450: ...RA 1...
Страница 452: ...3CP 1 1 1 1 1 1 Part names Figure 1 1 1 Switchback unit Switchback unit open close lever...
Страница 453: ...3CP 1 1 2 1 1 2 Machine cross section Figure 1 1 2 Paper path Switchback unit...
Страница 454: ...3CP 1 1 3 1 1 3 Drive system Figure 1 1 3 1 Switchback motor gear 2 Eject motor gear 3 Gear 23 31 4 Gear 21...
Страница 470: ...PF 75...
Страница 472: ...1 1 2 5FF 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Страница 475: ...5FF 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 3 Machine cross section...
Страница 513: ......