
2FD/2FF/2FG
2-1-21
CFM
(for second speed)
CFM
(for first speed)
PM
TC REM
DB REM
DM
FH-S
FH-M
MSW
Fixing temperature 165
°
C/329
°
F
(secondary stabilization)
Fixing temperature 110
°
C/230
°
F
(primary stabilization)
Copying enabled
Aging end
500 ms
500 ms
100 ms
900 ms
1 s
10 s
15 s
13 s
30 s
Full speed
Half speed
Half speed
Full speed
Timing chart 2-1-6 Fixing section operation
a
: 500 ms after the main switch (MSW) is turned on, fixing heater M (FH-M) turns on to heat the heat roller. At the same
time, cooling fan motor (CFM) turns on.
* The fan motor for second speed rotates at half speed and the motor for first speed rotates at full speed.
b
: 500 ms after fixing heater M (FH-M) turns on, fixing heater S (FH-S) turns on.
c
: 1 s after fixing heater M (FH-M) turns on, the polygon motor (PM) of the laser scanner unit turns on.
d
: When the fixing temperature reaches 110°C/230°F, the copier enters primary stabilization, and fixing heater M (FH-
M) turns off temporarily and turns on again after 13 s.
e
: 100 ms after the primary stabilization, the drive motor (DM) turns on. Also the cooling fan motor (for second speed)
switches to full speed rotation.
f
: 900 ms after the drive motor (DM) turns on, the developing bias (DB REM) turns on and at the same time transfer
charging (TC REM) starts.
g
: When the fixing temperature reaches 165°C/329°F, the copier enters secondary stabilization. Fixing heaters M and S
(FH-M and FH-S) are turned on and off to keep the fixing temperature at 165°C/329°F and aging starts.
h
: 10 s after copying is enabled, transfer charging (TC REM) ends.
i
: 30 s after the secondary stabilization, the drive motor (DM) turns off and the aging ends.
j
: 15 s after the drive motor (DM) turns off, the cooling fan motor (for second speed) switches to half speed rotation.
Содержание AD-63
Страница 340: ...AD 63...
Страница 343: ...3CX 1 1 2 1 1 2 Part names Figure 1 1 1 Duplex unit...
Страница 344: ...3CX 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path Duplex unit...
Страница 360: ...DF 78...
Страница 363: ...3B5 1 1 2 1 1 2 Part names Figure 1 1 1 1 Intermediate tray 2 JAM release lever 3 Eject tray...
Страница 397: ...J 1402...
Страница 400: ...3B6 1 1 2 1 1 2 Part names Figure 1 1 1 1 Job separator tray 2 LED...
Страница 401: ...3B6 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path...
Страница 402: ...3B6 1 1 4 1 1 4 Drive system Figure 1 1 3 1 Gear 20 2 Gear 28 3 Gear 28 4 Eject roller gear...
Страница 413: ...PF 70...
Страница 415: ...1 1 2 3CC 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Страница 417: ...3CC 1 1 2 1 1 2 Parts names 1 Upper drawer 2 Lower drawer 3 Desk left cover Figure 1 1 1 3 1 2...
Страница 418: ...3CC 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 2 Machine cross section...
Страница 450: ...RA 1...
Страница 452: ...3CP 1 1 1 1 1 1 Part names Figure 1 1 1 Switchback unit Switchback unit open close lever...
Страница 453: ...3CP 1 1 2 1 1 2 Machine cross section Figure 1 1 2 Paper path Switchback unit...
Страница 454: ...3CP 1 1 3 1 1 3 Drive system Figure 1 1 3 1 Switchback motor gear 2 Eject motor gear 3 Gear 23 31 4 Gear 21...
Страница 470: ...PF 75...
Страница 472: ...1 1 2 5FF 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Страница 475: ...5FF 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 3 Machine cross section...
Страница 513: ......