
2H0/2HZ
1-5-39
1-5-5 Developing section
(1) Detaching and refitting the developing unit
Follow the procedure below to replace the developing unit.
Procedure
1. Remove the drum unit (see page 1-5-38).
2. Remove two connectors.
Figure 1-5-72
3. Remove the developing unit.
4. Replace the developing unit and install the
unit.
5. Refit all the removed parts.
When the developing unit is replaced, per-
form maintenance mode U157 to clear the
counter value (see page 1-3-47).
Figure 1-5-73
Connector
Developing unit
Connector
Developing unit
Содержание 1102H03NL0
Страница 1: ...SERVICE MANUAL Published in April 2008 842H0112 2H0SM062 Rev 2 KM 2560 KM 3060...
Страница 4: ...This page is intentionally left blank...
Страница 10: ...This page is intentionally left blank...
Страница 14: ...2H0 2HZ This page is intentionally left blank...
Страница 20: ...2H0 2HZ 1 1 6 This page is intentionally left blank...
Страница 36: ...2H0 2HZ 2 1 2 16 This page is intentionally left blank...
Страница 202: ...2H0 2HZ 1 5 22 16 Remove four pins 17 Remove the scanner unit Figure 1 5 41 Pin Pin Scanner unit Pin Pin...
Страница 262: ...2H0 2HZ 2 1 20 This page is intentionally left blank...
Страница 323: ...INSTALLATION GUIDE FOR PAPER FEEDER...
Страница 324: ...CAUTION 2007 6 303K656810 PRECAUCION VORSICHT ATTENZIONE ATTENTION...
Страница 347: ...INSTALLATION GUIDE FOR BUILT IN FINISHER...
Страница 359: ...INSTALLATION GUIDE FOR JOB SEPARATOR...
Страница 369: ...INSTALLATION GUIDE FOR FAX System M...
Страница 385: ...INSTALLATION GUIDE FOR Data Security Kit C...
Страница 388: ...INSTALLATION GUIDE FOR UG 30...
Страница 391: ......
Страница 392: ......