
4. Calibrations
Special steel
connection
plates
Reference sensor
load cells 10 ton
4.4 Hopper calibration: RO-M EW CL-EW
(Pincode 8)
The Pin 8 calibration has to be done after changing a PCB, weight sensor or reference sensor.
During this calibration the following 5 steps will be done during this calibration
1.
The empty weight of the hopper
2.
The corresponding load cell value for an empty hopper
3.
The value of the reference sensor will be stored when machine is standing flat.
4.
The machine will store the value of the weight cell when the hopper is filled with a fixed weight
5.
The machine will store the value of the reference sensor under an angle.
Due to the difference in construction between the 1 load cell and 4 load cell machines the calibration
has a few additional steps
For a good and successful Pin 8 calibration please follow the steps one the next pages
58
Содержание EDW2
Страница 3: ...1 System overview 3 ...
Страница 9: ...1 1 5 1 Battery cable 9 1 System overview ...
Страница 10: ...Relay connections Not available on spare parts 1 1 5 1 Battery cable 10 1 System overview ...
Страница 11: ...2 1 5 2 IM Tellus connection cable 11 1 System overview ...
Страница 12: ...1 5 3 ISOBUS connector 3 12 3 5 2 1 6 4 7 8 9 1 System overview ...
Страница 13: ...1 6 Communication and power cables Machine side 13 1 System overview ...
Страница 32: ...3 1 Machine Software overview EDW ISO II 1 19 3 Software screens 32 ...
Страница 74: ...Example 2 74 6 Implement setting GEOCONTROL ...