
4. Calibrations
Step 2 Navigate to the correct screen
Go with the spanner in the mainscreen to menu Pin and enter the correct pin code in the screen. (Pin 8) After this go to screen “Hopper&act Calibrations”
Enter here
Pin 8
For more detailed information regarding the screen follow up please check § 3.1
Step 3 Entering calibration process
Press the red circled button below. And automatically the first calibration screen will pop-up
53
Содержание EDW2
Страница 3: ...1 System overview 3 ...
Страница 9: ...1 1 5 1 Battery cable 9 1 System overview ...
Страница 10: ...Relay connections Not available on spare parts 1 1 5 1 Battery cable 10 1 System overview ...
Страница 11: ...2 1 5 2 IM Tellus connection cable 11 1 System overview ...
Страница 12: ...1 5 3 ISOBUS connector 3 12 3 5 2 1 6 4 7 8 9 1 System overview ...
Страница 13: ...1 6 Communication and power cables Machine side 13 1 System overview ...
Страница 32: ...3 1 Machine Software overview EDW ISO II 1 19 3 Software screens 32 ...
Страница 74: ...Example 2 74 6 Implement setting GEOCONTROL ...