Installation
•
Before installing the pellet boiler approval must be obtained from the responsible master chimney
sweep.
•
A flue gas system must be available that is approved for the operation of the pellet boiler.
•
Please check whether planning permission is required.
•
The boiler may only be installed by an approved heating specialist.
•
When installing the boiler, ensure that all combustible or temperature-sensitive materials (cables,
insulation) are kept at least 40 cm away from the exhaust gas duct and 20 cm away from the boiler
shell.
•
No combustible materials are permitted to be directly beside, above or in front of the boiler or the
filling hose. They must always be kept a minimum of 40 cm away.
•
The boiler installation (heating system, electrical supply, safety equipment) must be state of the
art.
•
If the heating system is operated with a flow line temperature of more than 100
◦
C , the boiler
plant must be reported to the responsible trade supervisory centre in accordance with the German
Ordinance on Steam Boilers.
•
The relevant standards and building authority regulations must be complied with. Among other
regulations, the following apply: the German Fire Code (FeuVo), the Federal Immission Control
Ordinance (BImSchV.), the VDE guidelines, EN 303-5 and to the heating system DIN 4751.
1.3.1
The boiler room
The pellet boiler may only be installed and the pellets stored in a dry, frost-proof room that is approved for
the installation of boilers and the storage of fuels. The building contractor is to ensure that the installation
space is sufficiently ventilated.
A level, sufficiently strong floor manufactured from non-combustible material is adequate for the
installation of the pellet boiler. Should a foundation pedestal be used, this is to be made at least as
large as the dimensions of the boiler. The installation must also comply with the local regulations and
guidelines applicable to boiler room installations.
The boiler installation should already take account of the subsequent position of the materials handling
system!
5
Содержание PK 10
Страница 1: ...Installation manual pellet boiler PK 10 PK 15 and PK 20 May 4 2009 ...
Страница 21: ...Figure 22 PK3 system package Wiring diagram Figure 23 Wiring diagram for PK3 system package 21 ...
Страница 25: ...4 Technical data Figure 26 The PK pellet boiler Figure 27 Connecting dimensions 25 ...
Страница 28: ...Figure 29 Wiring diagram for pellet boiler 28 ...
Страница 29: ...Figure 30 Wiring diagram for PK 230V conveyor screw drive 29 ...
Страница 30: ...Figure 31 Wiring diagram for PK 400V conveyor screw drive 30 ...
Страница 31: ...Personal notes 31 ...
Страница 32: ... ...