Merger
56
Merge Maxx 900
Instructions for work
Ground pressure reduction
Increase pressure in the hydro-pneumatic accumulators
to reduce the pick-up ground pressure:
- Check that valves (1) and (2) are shut-off.
- Operate and maintain hydraulic valve
I
control lever to
pressurize the circuit.
- Slowly open hydraulic unit valve (2).
- Check pressure increase on gauges (3).
- When the required pressure is reached, close the
valve (2).
Tighten valve by hand.
When proceeding to the adjustment, the
pressure exceeds the required value, refer to
"Ground pressure increase" section.
Содержание Merge Maxx 900
Страница 1: ...KN093CGB C OPERATOR S MANUAL Merger Merge Maxx 900 KN093CGB C English 04 2010...
Страница 2: ......
Страница 86: ...Merger 84 Merge Maxx 900 Maintenance and storage Grease The steering system...
Страница 87: ...Maintenance and storage Merger Merge Maxx 900 85 The left arm pivot points...
Страница 88: ...Merger 86 Merge Maxx 900 Maintenance and storage The right arm pivot points...
Страница 89: ...Maintenance and storage Merger Merge Maxx 900 87 The undercarriage articulations...
Страница 90: ...Merger 88 Merge Maxx 900 Maintenance and storage Oil The coupling yokes The parking stand The transport locks...
Страница 107: ...Appendix Merger Merge Maxx 900 105 T Axle loads Tractor only...
Страница 109: ...Limited warranty Merger Merge Maxx 900 107 Limited warranty...
Страница 110: ...Merger 108 Merge Maxx 900 Limited warranty...
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......