6. - Putting into service
HRB122-152-182
39
KN135HGB_D
Power harrows
Offset adjustment
- Park the machine on an even fairly level
ground.
lower links:
- Loosen U-bolts (1).
- Unscrew the 2 nuts (2).
- Slide and adjust guard (3).
- Slide lower coupling yoke (4) to the required
position.
- Tighten the 2 nuts (2):
• Torque: 22 daNm (162 lbf ft).
- Tighten U-bolts (1).
- Proceed the same way on the other side.
Headstock:
The offest adjustment must be made before
coupling the machine to the tractor.
- Remove the 12 hitch frame attachment screws (1).
- Move hitch frame sideways.
- Reinstall and tighten screws (1):
• Torque setting for screws: 10 daNm (73 lbf ft).
2
4
2
3
1
1
1
1
1