Power harrows
74
HR303D/M
Maintenance and storage
2. Cleaning the machine
- Regularly check side deflectors.
- Regularly clean roller and roller scraper bar:
In case of clogging, pivot scraper crossbar:
Packer PK2 roller: (a)
• Unscrew the 4 nuts (1).
• Remove the 2 tensioning devices (2).
• Slide lever in sleeves (3).
• Pivot scraper bar using lever.
• Clean and reassemble the unit.
Tightening torque: (1) 22 daN m (162 lbf ft).
Maxipacker roller: (b)
• Unscrew the 6 nuts (1).
• Remove the 2 tensioning devices (2).
• Slide lever in sleeves (3).
• Pivot scraper bar using lever.
• Clean and reassemble the unit.
Tightening torque: (1) 22 daN m (162 lbf ft).
Check regularly that there are no foreign
objects wrapped around the blade
holder(twine, wire, crop residues,...). To
prevent premature bearing housing wear,
remove foreign bodies wrapped around
them.
Содержание HR303D
Страница 1: ...OPERATOR S MANUAL Power harrows HR303D M KN110FGB A English 12 2006...
Страница 2: ......
Страница 56: ...Power harrows 54 HR303D M Optional equipment HR303M Kit no 1237420 Set of 19 and 26 teeth gearwheels...
Страница 91: ...Limited warranty Power harrows HR303D M 89 LIMITED WARRANTY...
Страница 92: ...Power harrows 90 HR303D M Limited warranty...
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......