7. - Instructions for transport
GA6501
37
KN255AGB F
Gyrorake
7. Instructions for transport
7.1
Putting the machine into
transport position
From the working position:
- Pull release cord until lift stops (1) have been
released.
- Activate the tractor double acting valve to fully fold
the arms.
- Release cord.
- Make sure the transport locks of rotor arms (1) are
fully engaged.
Before placing the machine into transport
position:
- Wait until the rotating parts have come to a
complete stop.
- Check that nobody is within the machine
pivoting area.
- If there is someone, make sure the person
moves away.
1
1
1
1