Putting into service
Mower conditioner
FC313 RF
21
$
PUTTING INTO SERVICE
1. Description of control elements
The machine is supplied with an 18 box spanner to carry
out certain adjustment and maintenance tasks.
2. Coupling and uncoupling
The machine adapts to tractors equipped with a front
mounted 3-point lift linkage fitted with a quick release
’’A’’ frame coupler category 2 (ISO 11001).
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines (1).
- 2 check chains (2).
- One hydraulic hose which controls the machine
transport/work position setting (3).
- An 7-pin electric plug for the electrical signalling
equipment (4).
1
3
4
1
2
Содержание FC313 RF
Страница 1: ...OPERATOR S MANUAL Mower conditioner FC313 RF KN021AGB C English 02 2005...
Страница 2: ......