
SERVICE WORK ON THE CHASSIS
50
400984-10
–
Measure material thickness
at the bottom of the chain guide.
Minimum distance
at the lowest
point
12 mm (0.47 in)
» If distance
is less than the specified measurement:
–
Change the chain guide.
x
B00347-01
–
Check that the chain guide is firmly seated.
» If the chain guide is loose:
–
Tighten the chain guide.
Guideline
Remaining screws, chassis
M6
10 Nm
(7.4 lbf ft)
–
Remove the motorcycle from the lift stand. (
10.39
Adjusting the chain guide
x
B00348-10
–
Loosen screw
. Remove screw
. Swing the chain guide down.
Condition
Number of teeth:
≤
44 teeth
–
Insert collar bushing
in hole
. Position the chain guide.
–
Mount and tighten screw
. Tighten screw
.
Guideline
Remaining screws, chassis
M6
10 Nm
(7.4 lbf ft)
Condition
Number of teeth:
≥
45 teeth
–
Insert collar bushing
in hole
. Position the chain guide.
–
Mount and tighten screw
. Tighten screw
.
Guideline
Remaining screws, chassis
M6
10 Nm
(7.4 lbf ft)
10.40
Checking the throttle cable routing
–
Remove the fuel tank.
x
B00320-10
–
Check the throttle cable routing.
Both throttle cables must be routed to the throttle valve body side by side behind
the handlebars and above the tank bearing.
» If the throttle cable is not routed as specified:
–
Correct the throttle cable routing.
–
Install the fuel tank.