19
STORAGE
95
19.2
Putting into operation after storage
401059-01
–
Install the battery.
(
p. 78)
–
Remove the motorcycle from the lift stand. (
p. 39)
–
Perform checks and maintenance steps before putting into operation. (
p. 22)
–
Take a test ride.