background image

37 

W00 

风扇堵转 

Fan Lock 

W01 

过载报警 

Over Load 

W02 

电池未连接 

Bat Volt Open 

W03 

电池欠压 

Bat Volt Under 

W04 

电池电压低 

Bat Volt Low 

W05 

电池电压高 

Bat Volt High 

W06 

电网电压低 

Grid Volt Low 

W07 

电网电压高 

Grid Volt High 

W08 

电网频率低 

Grid Frequency Low 

W09 

电网频率高 

Grid Frequency High 

W10 

漏电流高 

GFCI Over 

W11 

PV 未接 

Solar Loss 

W12 

外置 CT 反接 

Tran Reverse 

W13 

BUS 电压低 

Bus Volt Under 

W14 

BUS 电压高 

Bus Volt Over 

W15 

逆变器过流 

INV Current Over 

W16 

充电过流 

CHG Current Over 

W17 

母线震荡 

Bus OSC Fail 

W18 

逆变欠压 

INV Under Volt 

W19 

逆变过压 

INV Over Volt 

W20 

逆变频率异常 

INV Frequency Loss 

W21 

环境温度过高 

NTC Temp High 

W22 

串口通信失败 

SciParall Fail 

 

2

Error codes 

Error codes

 

Codes Chinese 

description 

English 

description 

F00 

母线软启超时 

Bus Soft Time Out 

F01 

逆变器软启超时 

INV Soft Time Out 

F02 

母线短路 

Bus Volt Short 

F03 

逆变器短路 

INV Volt Short 

F04 

风扇堵转错误 

Fan Fail 

F05 

PV 绝缘阻抗低错误 

PV ISO Under Fail 

F06 

母线软启继电器错误 

Bus Soft Relay Fail 

F07 

电网继电器错误 

Grid Relay Fail 

All manuals and user guides at all-guides.com

Содержание KSE-4.6k-48

Страница 1: ...ttery connection 10 5 5 4 RS485 Communication connection 12 5 5 5 RS232 and dry contact 13 5 5 6 External CT connection 13 6 Instructions for LED indicator 15 7 Working mode 16 7 1Self generation and...

Страница 2: ...s an intelligent try and facilitat ct current throu ply batteries for Besides the po d based on pract e in terms of If there is anyth he constant imp timely notificat s ration and main locally accepte...

Страница 3: ...l as daily garba up g limit Six laye andle with care inst damp Wait for 5 min discharged ing diagr Hybrid inverte ns in the manua Electric shock age but recyclin ers at most nutes after pow ram d er l...

Страница 4: ...unting screw 8 4 Expansion tube 4 Used for fixing the installation pendants 5 Self tapping screw 4 Used for fixing the installation pendants 6 Combined screw 2 Used for fixing the inverter on the inst...

Страница 5: ...Giv tall the inverter iation rain sno 1 1 1 Figure 4 DC switch PV interface RS485 CAN B ternal CT interf ven the cooling r in a well venti ow and others s Providing users installation ope fault diagn...

Страница 6: ...r specific pend e 10 percussio ertically or tilte rward leaning o ventilated surfa and easy dism than the below drilling position dant dimension on drill as tool Figure 6 Figure 7 ed no more than or h...

Страница 7: ...the hammer to make it fully into the wall then align the rack to the hole and tighten it with the self tapping screw Gently hang the inverter onto the rack top down lock the setscrews flanking the in...

Страница 8: ...connecti inverter must b e and ground w r between the in ealing ring gh the nut singl shown in Figu shown in Figur g terminal and w o pass through th e inverter tighte Figure ing or Figure 12 ion e re...

Страница 9: ...ver or electric ectric screwdriv nut nal to the corres screw driver s ver should be 4 Figure 14 Figure 15 ponding hole s suggestion ste 4mm and 8 12 5 ite of the invert em diameters a 2kg f cm respec...

Страница 10: ...the s test pen into the While withd screwdriver pul Loosen fa Pry the lo is shown in St Pull out o connecting wi Pry the sp screwdriver an al d on the bod ded PV input c able with the inn being 12AWG...

Страница 11: ...refer to Insula ngle aperture sea n on may damag by a reverse and chemical co tween the inve tem it is advis a of conductor f uninsulated w ries complies w reaker between ture sealing ring ugh the nut...

Страница 12: ...ca rminal is connec ng terminal to ewdriver or w n lock the batt refer to Figur ed Cable Pan hea Figure 2 minal and cable able is free to p cted to the hole the correspond wrench sugge tery protectiv...

Страница 13: ...aperture sealing ring 4 Pass the cable successively through the nut single aperture sealing ring insulator and shee metal parts 5 Insert eight wire cores of the cable into the corresponding slot of cr...

Страница 14: ...ater proof co Ca RS 485 wa AN BMS ontact erface which is on which key 7 ction omponents of ex Single apertu able Nut aterproof compo Figure 2 RS232 Figure 24 used for progr 7 and 8 are sign xternal CT...

Страница 15: ...keep p of external CT sure the connec Single Nut F ingle aperture s oof components pushing the loc T into the hole ction is secure 25 e aperture seali I Figure 26 Figure 2 sealing ring ckwire groove...

Страница 16: ...n port of externa CT and then bu xternal CT sho ns for LE HYBRYD Green ff to Step 4 and tighten the al CT The arro uckle it ould be placed ED Indic D EPS Green ff Figure 28 Figure 2 e water proof sh o...

Страница 17: ...2 Battery priority Power converted by inverter from solar energy will first be used to charge the battery with the residual power for the load 7 3 Peak load shifting The energy will be stored when th...

Страница 18: ...d 00000 Press UP DOWN button Press ENTER button Press ENTER button Choose according to local power grid Restart 3 Grid standards Press ENTER button Enterpassword 4 Operation parameters 1 Reactive powe...

Страница 19: ...ystem will pop up an interface indicating the setting error Charging and discharging time will return to the state prior to setting Press ENTER button Enter password 1 System setting Setting Press ENT...

Страница 20: ...time current PV1 input power PV2 INPUT VOLT 49 8V CURR 0 00A POWER 0W PV2 input real time voltage PV2 input real time current PV2 Input power Bus voltage of the system DCVOLTAGE BUS V BATTERY VOLT 42...

Страница 21: ...OUTPUT VOLT 0 0V CURR 0 00A FREQ 0 00Hz Mains Real time voltage CT real time current Grid connected real time frequency INV OUTPUT VOLT 0 0V CURR 0 00A FREQ 0 00HZ Inverter real time voltage Inverter...

Страница 22: ...sition of grid connection to off grid transition of off grid to grid mode DCDC standby mode soft start mode charging mode discharging mode POWER PV I P W LOAD W BAT W PV real time total power BACKUP r...

Страница 23: ...face See chapter 8 2 for more setting details Enter the password before setting up the user Interface Description After entering the setup interface the system will prompt to input password The defaul...

Страница 24: ...ing interface refer to 8 3 1 There are 6 options in total including working mode backup enable mandatory charging of mains program controlled enable boot delay time PV input type see from to Working m...

Страница 25: ...here is no PV enable this setting to mandatorily charge the battery through the mains The default option is disabling which is invalid in thestate of peak load shifting Program controlled enable Inter...

Страница 26: ...ee from to Battery type Interface Description This interface is used to select battery type Press UP DOWN button to move corresponding options Press ENTER button to enter the selected menu Select the...

Страница 27: ...e Press Enter button to move cursor backward confirm input and return to battery parameters interface Press ESC button to move cursor forward and return to battery parameters interface Discharge depth...

Страница 28: ...to battery parameters interface 8 2 3 Grid standard Interface Description Press UP DOWN button to move corresponding options Here are eleven countries for selection including China Germany Australia...

Страница 29: ...ers interface Power factor setting Interface Description Press UP DOWN to increase or decrease the input figure Press ENTER button to confirm or ESC button to cancel the input and return to working in...

Страница 30: ...to confirm or ESC button to cancel the input and return to operation parameters interface The input value should range between 0 and 100 Charge power Interface Description Press UP DOWN to adjustthe i...

Страница 31: ...input and return to operation parameters interface The value should range between 240V and 280V which varies with different standards Low grid frequency Interface Description Grid Low Frequency Protec...

Страница 32: ...e input value should range between 1 and 64 8 2 6 485 Baudrate Interface Description Press UP DOWN button to move corresponding options Press ENTER button to confirm or ESC button to cancel the select...

Страница 33: ...ear all the previous history in Inquiry Record menu Press UP DOWN buttonto move corresponding options Press ENTER button to confirm or ESC button to cancel the selection and return to setup interface...

Страница 34: ...ative options machine model serialnumber firmware version and running records refer to 1to4 Machine model Interface Description This interface displays machine model of the inverter Press ESC button t...

Страница 35: ...face is used to select statistics items Press UP DOWN button to move corresponding options Press Enter to enter the selected menu Press ESC button to return to user interface There are eight alternati...

Страница 36: ...e displays power generation for the day KWH PV power generation Grid connection power generation Power consumption of load and inverter Press ESC button to return to statistics interface The week Inte...

Страница 37: ...n Interface Description This interface displays gross power generation PV power generation Grid connection power generation Power consumption of load and inverter Press ESC button to return to statist...

Страница 38: ...W14 BUS Bus Volt Over W15 INV Current Over W16 CHG Current Over W17 Bus OSC Fail W18 INV Under Volt W19 INV Over Volt W20 INV Frequency Loss W21 NTC Temp High W22 SciParall Fail 2 Error codes Error c...

Страница 39: ...peration as well as their corresponding basicsolutions Fault diagnosis table Types Codes Solutions Bus Soft Time 0ut F00 1 Please contact the distributor INV Soft Time Out F01 1 Check whether the load...

Страница 40: ...t until it functions normally 2 Contact customer service if error warning continues PV Input Short F11 1 Restart the inverter and wait until it functions normally 2 Contact customer service if error w...

Страница 41: ...nt leakage 3 Contact the local inverter customer service if fault remains unremoved Solar Loss W11 1 PV is not connected 2 Check grid connection 3 Check PV availability Tran Reverse W12 1 Check whethe...

Страница 42: ...m PV input power 4600w 2300w 5600w 2800w 5600w 2800w Maximum PV input voltage 550V 550V 550V MPPT Range 155 500V 188 500V 200 500V Minimum input startup voltage 100V 150V 100V 150V 100V 150V Maximum i...

Страница 43: ...tion measurement switch optional optional optional Earth fault protection Grid monitoring YES YES YES Input reverse polarity protection AC short withstand protection isolation method YES YES YES RCMU...

Страница 44: ...ine Warranty 5 5 5 Grid specification single phase Grid specification Output Voltage Range Vac OutputFrequency Range Hz Boot Time S China 187 252 48 50 5 60 Germany 196 262 47 5 51 5 60 Australia 180...

Отзывы: