24
Time setup
Interface Description
This interface is used to opt for the time of
peak load shifting
Press UP/DOWN button to move the
corresponding options.
Press ENTER to enter the selected menu.
Press ESC button to return to the working
mode interface.
②
Backup enable
Interface
Description
It is enabled when BACKUP load needs
power.
Default option isEnabling.
③
Mandatory charging of mains
Interface
Description
Mandatory charging of mains: When the
battery is dire need of power and there is
no PV, enable this setting to mandatorily
charge the battery through the mains.
The default option is disabling, which is
invalid in thestate of peak load shifting.
④
Program-controlled enable
Interface
Description
The power switch of the machine can be
realized through remote control.
Default option is disabling.
⑤
Grid connecting time delay
Interface Description
The input value ranges from 20 to 300,
which varies with different standards.
CHAG START: 00
:
00
CHARGE END:00
:
00
DISC START: 00
:
00
DISCHA END: 00
:
00
--EPS ENABLE -
→
1
:
DISABLE
2
:
ENABLE
--GRID CHARGE --
→
1: DISABLE
2: ENABLE
--REMOTE CTRL--
→
1: DISABLE
2: ENABLE
START-UP DELAY
INPUT: 30
UNIT: SEC
All manuals and user guides at all-guides.com