close proximity to these bolts.
For a bolt-to-bolt clearance > 800 mm, fit additional shims (3) halfway between
the adjoining holes.
All shims must lie perfectly flush.
4. Insert the foundation bolts (4) into the holes provided.
5. Use concrete to set the foundation bolts (4) into the foundation.
6. Wait until the concrete has set firmly, then align the baseplate.
7. Tighten the foundation bolts (4) evenly and firmly.
5.3.2 Vertical installation
CAUTION
Viscosity of fluid handled > 15mm²/s and installation with "motor on top"
Pump damage during start-up!
▷
Manually prime/vent the motor space during start-up (pump set will not be self-
venting).
1
2
Fig. 8: Vertical installation
1
Installation type "Motor below"
2
Installation type "Motor on top"
✓
The wall has the required strength and characteristics.
✓
The wall has been prepared in accordance with the dimensions given in the
outline drawing/general arrangement drawing.
✓
The plug fixings used are suitable for the pump weight.
1. Remove the covers from the suction and discharge flanges.
2. Position the pump in the required place of installation with a floor-mounted
support or crane.
3. Insert the fastening bolts into the casing foot and tighten them sufficiently to
make sure the pump set cannot tip over.
4. To prevent any stresses and strains when tightening the bolts completely, remove
any floor-mounted supports from underneath the pump set.
5. Align the pump set with the help of a spirit level placed on the suction nozzle
and the motor housing in such a way that the discharge nozzle flange is in
vertical position.
6. Use shims for height compensation, if necessary.
All shims must lie perfectly flush.
7. Tighten the fastening bolts at the pump foot completely.
8. Tighten the support foot (if any) at the motor without transmitting any stresses
or strains.
Use shims for height compensation, if necessary. All shims must lie perfectly flush.
5 Installation at Site
20 of 60
Etaseco/Etaseco I
Содержание Etaseco C
Страница 59: ......