Commissioning
33
Pos : 14.17 /Ü berschrif ten/Ü berschrif ten 2/ P-T/Spannungs versorgung @ 28\ mod_1250578107003_78.doc @ 275490 @ 2 @ 1
5.5
Electrical power supply
Pos : 14.18 / BA/Ers tinbetriebnahme/ Spannungs vers orgung/Dauerstroms tec kdos e Bild @ 36\mod_1260454934575_78.doc @ 336632 @ @ 1
SW2000058
1
2
3
Fig. 8
Pos : 14.19 / BA/Ers tinbetriebnahme/ Spannungs vers orgung/St ec kdos e an di e 12V Bat teri e des Sc hl eppers ansc hließ en @ 36\ mod_1260450375075_78.doc @ 336557 @ @ 1
The machine requires a voltage source for the power supplyof the on-board computer (control
unit). A socket (12V DIN 9680) for installation on the tractor is part of the scope of supply.
The socket has to be attached in order to provide the machine with the required electricity for
start-up.
Connect the socket included with delivery (1) directly to the 12V battery of the tractor
•
Connect the connector terminal (2) of the red cable (+) directly to the “+” terminal of the
tractor battery.
•
Connect the connector terminal (3) of the black cable (-) directly to the “-” terminal of the
tractor battery.
Pos : 14.20 /Ü berschrif ten/Ü berschrif ten 2/ A-E/ Anbau an den Traktor @ 0\ mod_1199717845194_78. doc @ 34039 @ 2 @ 1
5.6
Mounting onto the Tractor
Pos : 14.21 / BA/I nbetri ebnahme/ Schwader/ Anbau an den Traktor/ Anbau an den Traktor Sc hwader 2000 @ 22\ mod_1239693707510_78. doc @ 232225 @ @ 1
SW2000001
Fig. 9
•
Hitch machine with the steerable pinions onto the tractor.
•
Fix lower suspension arms
•
Place the machine onto the parking supports.
Pos : 14.22 / BA/-----Seit enumbruc h------ @ 0\ mod_1196175311226_0. doc @ 4165 @ @ 1