7.5 Shutting down
7.5.1 Temporary shut-down
Fig. 5: Temporary shut-down
1.
Disrupt the spraying process by releasing the pull lever ( Fig. 5/1).
2.
Close the material supply and switch off the fluid pressure pump if necessary.
3.
Release the residual energy by activating the pull lever ( Fig. 5/1).
7.5.2 Long-term shut-down
Fig. 6: Long-term shut-down
Operating instructions
T-Dok-198-GB-Rev.3
[email protected], www.krautzberger.com
GB–24
Содержание 090-3566
Страница 60: ......