
12
Fig. 8 - Rough Opening for Installing in Corner
IMPORTANT
: When finishing your firebox, combustible
materials such as wall board, gypsum board, sheet rock,
drywall, plywood, etc, must have ½ -in. clearance to the sides
and top of the firebox. Combustible materials should never
overlap the firebox front.
WARNING
: Do not allow any combustible materials to
overlap the firebox front.
WARNING
: Do not allow combustible or noncombustible
materials to cover any necessary openings like louvered
slots.
WARNING
: Never modify or cover the louvered slots on
the front of the firebox.
Step 1
Step 3
Step 2
Fig 9
Remove two
screws on top
firebox panel
Insert three
screws on
hood
Assembling Hood
CAUTION
: Do not operate fireplace without hood in place.
1. Fireplace hood is positioned on top of shipping inner pack.
2. Remove top of firebox by unscrewing two screws located
on each end. Insert the hood along the upper side of the
heat insulation board (see Fig. 9). Attach the hood with
3 screws. Re-attach the firebox top by re-inserting the two
screws.