Page 18
Maintenance every 3 years
Maintenance volume from the yearly maintenance and the following additional work
Visual check and cleaning of the hoist basket lever for the heat exchanger cleaning:
In addition, remove the boiler cover, vacuum out the existing ashes and check the function of the hoist basket lever.
According to function control, using caulking strip newly caulk the boiler cover and reassemble.
Cleaning of secondary air channels in burnpot and the base of burnpot.
Detach the hopper tank from the boiler firstly. Then remove the burnpot carefully. (See pictures below)
Test run of all electrical equipment
If necessary, exchange the ignition blower (after approx. 500 hours of operation)
If necessary, exchange the coal for the suction turbines. (after approx. 500 hours of operation)
Cleaning of secondary air channels in burnpot and the base of burnpot.
Содержание SLIMPEL
Страница 8: ...Page 8 SPECIFICATIONS SLIMPEL 25...
Страница 9: ...Page 9 SLIMPEL 40...
Страница 10: ...Page 10 AIR ELIMINATOR VALVE BLOW OFF...
Страница 14: ...Page 14 This page intentionally left blank...
Страница 21: ...Page 21...