17 |
P a g e
Cleaning of secondary air channels in burnpot and the base of burnpot
Disconnect hopper from boiler and unscrew internal pellet feed auger from cumbustion chamber
Unscrew burnpot from cumbustion chamber and remove for cleaning
In Addition
Inspection of the grate cleaning lever
Inspection of gaskets on the combustion chamber door and ash box
Operational test of the heat exchanger cleaning
Cleaning of the exhaust sensor
Test the ignitor tube for residue
Test upper and lower parts of the burner for damage and leaks
Test the intervals of the sensors (grate motor, separator)
Lubrication of the heat exchanger cleaning drive and grate bar
Exhaust gas measurement
Maintenance every 3 years
Maintenance volume from the yearly maintenance and the following additional work
Visual check and cleaning of the hoist basket lever for the heat exchanger cleaning:
In addition, remove the boiler cover, vacuum out the existing ashes and check the function of the hoist
basket lever. According to function control, using caulking strip newly caulk the boiler cover and
reassemble.
Cleaning of secondary air channels in burnpot and the base of burnpot.
Detach the hopper tank from the boiler firstly. Then remove the burnpot carefully.
Test run of all electrical equipment
Содержание Propel 25
Страница 8: ...8 P a g e SPECIFICATIONS Propel 25 Propel 40...
Страница 9: ...9 P a g e FOR PROPEL 25 FOR PROPEL 40 AIR ELIMINATOR VALVE BLOW OFF AIR ELIMINATOR VALVE BLOW OFF...
Страница 13: ...13 P a g e This page intentionally left blank...
Страница 20: ...20 P a g e...
Страница 21: ...21 P a g e...
Страница 22: ...22 P a g e...
Страница 23: ...23 P a g e...
Страница 24: ...24 P a g e...
Страница 25: ...25 P a g e...