Kozlusan Propel 25 Скачать руководство пользователя страница 12

12 | 

P a g e

 

 

Chimney Installation 

 

 

A chimney performs two functions: it removes smoke and flue gases from the heating system, and it 

provides “draft” for the fire. Draft is the term used to describe the suction that occurs when hot air 

rises and creates a vacuum in the firebox. That vacuum draws fresh air into the firebox and feeds 

combustion of the wood. No heating system can operate properly without adequate draft.  

Proper installation of the chimney flue is critical to the performance of your Kozlusan Heating System. 

The majority of problems encountered after installation are attributable to a flue that is improperly 

sized or otherwise provides inadequate draft to the heating system.  

You may connect the Kozlusan Heating System to an existing flue or chimney subject to the following 

conditions.  

1. A qualified professional has inspected, repaired (if necessary), thoroughly cleaned the chimney and 

determined it is suitable for use with a residential heating appliance that burns solid fuel.  

2. The chimney or flue should be at least 3-4 m tall and sized correctly for the Kozlusan Heating 

System model installed.  

3. Do not share a flue with another heating system, appliance or fireplace. Do not use a flue that 

already provides make-up air to the cellar or basement.  

4. Tightly close the cleanout opening in the base of the chimney.  

 

Frost & Overheat Protection 

 

The heating system is leak-tested at the factory during final assembly, and the heat transfer fluid 

drained for shipment. The recommended solution is a mix of 30% propylene glycol to 70% water 

unless you are located in a very cold climate, or you plan to leave the heating system unused for a long 

period of time. A 30% solution of propylene glycol is adequate to lower the freezing point to -13º C 

and raise the boiling point to 102º C. 

CAUTION: DO NOT 

use ethylene glycol-based (automotive antifreeze) coolant in your Kozlusan 

Heating system or in your home’s heating system. Always use 

propylene glycol

-based coolants

 

 

 

 

 

Содержание Propel 25

Страница 1: ...98 Lurgan Road Dromore Craigavon Co Down Northern Ireland BT25 1HL Tel 44 0 28 38 820 043 Fax 44 0 28 38 820 987 Email info geeltd org MODEL PROPEL BE SURE TO READ THIS MANUAL AND KEEP IT NEAR THE HEA...

Страница 2: ...ction Page Introduction 3 Safety instructions 4 How to biomass system Works 6 Specifications 8 Installation 11 Operating the Heating system 14 Maintenance Overview 15 Troubleshooting 18 Installation S...

Страница 3: ...horized qualified technicians Do not use any other fuels than specified below Norm M 7135 DIN PLUS Norm SWISSPELLET Diameter 6 mm Length 5 30 mm 20 45 mm DD CEN TS 14961 2005 Only this way low emissio...

Страница 4: ...nance work Wait until the pellet boiler has cooled down check the temperature on the display The boiler needs to be switched off before carrying out the cleaning of the chimney Wait until the pellets...

Страница 5: ...boiler Annual control of safety devices by a specialist Regular control of expansion tank by a specialist Regular control of pellet feeding devices automatic ignition devices and feeding features Ple...

Страница 6: ...stand some of the terminology used to describe the systems operation Air Flow through the Biomass heating system 1 Fuel is fed from the fuel store via an auger The fuel is poured from the top into the...

Страница 7: ...out 80 85 C 3 The fluid flows past an aquastat water thermostat that regulates the burn rate of the heating system in conjunction with the flue gas temperature sensor that measure the temperature in t...

Страница 8: ...8 P a g e SPECIFICATIONS Propel 25 Propel 40...

Страница 9: ...9 P a g e FOR PROPEL 25 FOR PROPEL 40 AIR ELIMINATOR VALVE BLOW OFF AIR ELIMINATOR VALVE BLOW OFF...

Страница 10: ...ressure bar 3 3 Test Pressure 4 3 4 3 Max Suction Flow Rate Of Flue m h 60 100 Exhaust Fan sucktion pressure at full load pascal 7 10 Dimensions Total Weight kg 420 480 Water Content lt 65 127 Bunker...

Страница 11: ...es all draw air from the room Be certain there is an adequate source of fresh air ventilation to offset these demands or you may create negative pressure in the room and prevent the heating system of...

Страница 12: ...the chimney and determined it is suitable for use with a residential heating appliance that burns solid fuel 2 The chimney or flue should be at least 3 4 m tall and sized correctly for the Kozlusan He...

Страница 13: ...13 P a g e This page intentionally left blank...

Страница 14: ...OT throw fuel into the burnpot via the access door 8 Keep the access door closed tight except when tending the burnpot 9 Keep the heating system area clear of combustible materials gasoline and other...

Страница 15: ...relief valve at least once a year 5 Check the water pressure is between 1 and 2 bar if too low top up system with more water 6 DO NOT clean heating system surfaces when the unit is hot Wait until the...

Страница 16: ...nd to let the boiler cool down for at least 6 8 hours later switching off the system before proceeding with these works Yearly Maintenance Cleaning Heat exchanger and baffles Remove outer body cover a...

Страница 17: ...est the intervals of the sensors grate motor separator Lubrication of the heat exchanger cleaning drive and grate bar Exhaust gas measurement Maintenance every 3 years Maintenance volume from the year...

Страница 18: ...tive temperature sensor Inform customer service Error Back burning to auger The temperature of the augerexceeded the limit thermostat s value Back burning to auger Defective back burning detection the...

Страница 19: ...w to heat up The boiler is on utility water operation mode Change operating mode Hydraulic problem Contact installer Altered heating curve Adjust Heating circuit pump is defect Inform customer service...

Страница 20: ...20 P a g e...

Страница 21: ...21 P a g e...

Страница 22: ...22 P a g e...

Страница 23: ...23 P a g e...

Страница 24: ...24 P a g e...

Страница 25: ...25 P a g e...

Отзывы: