background image

15 | 

P a g e

 

 

MAINTENANCE OVERVIEW 

 

Safety Practices 

 

 

1. Check your fuel supply regularly and allow suitable time for deliveies 

 try not to run out of fuel  

2. Check the ash box and empty regularly.  

3. Inspect chimney, flue pipes, flue pipe joints, and flue pipe seals regularly to ensure that smoke and 

flue 

gases are not drawn into, and circulated by, your home‟s air circulation system. If you observe 

rust or any smoke leakage, replace the pipe immediately.  

4. Exercise the safety relief valve at least once a year.  

5. Check the water pressure is between 1 and 2 bar 

 if too low top up system with more water.  

6. 

DO NOT 

clean heating system surfaces when the unit is hot. Wait until the unit cools and then 

clean with soap and water.  

 

ATTENTION 

 

This work may only be performed by certified specialists or by Kozlusan customer 

service personel. The boiler requires a minimum of 1 anual service by certified personel 

to maintain warranty guarantee! 

Periodical Maintenance 
 
 
                                                             Brushing Burnpot 

 

 
 
 
 
 
 
 
 
 



Take out front door cover      Unloose the star handles        Remove burnpot door   

 

 




 
    Brush inside the burnpot and remove the flue ashes in the combustion chamber with vacuum cleaner 

Содержание Propel 25

Страница 1: ...98 Lurgan Road Dromore Craigavon Co Down Northern Ireland BT25 1HL Tel 44 0 28 38 820 043 Fax 44 0 28 38 820 987 Email info geeltd org MODEL PROPEL BE SURE TO READ THIS MANUAL AND KEEP IT NEAR THE HEA...

Страница 2: ...ction Page Introduction 3 Safety instructions 4 How to biomass system Works 6 Specifications 8 Installation 11 Operating the Heating system 14 Maintenance Overview 15 Troubleshooting 18 Installation S...

Страница 3: ...horized qualified technicians Do not use any other fuels than specified below Norm M 7135 DIN PLUS Norm SWISSPELLET Diameter 6 mm Length 5 30 mm 20 45 mm DD CEN TS 14961 2005 Only this way low emissio...

Страница 4: ...nance work Wait until the pellet boiler has cooled down check the temperature on the display The boiler needs to be switched off before carrying out the cleaning of the chimney Wait until the pellets...

Страница 5: ...boiler Annual control of safety devices by a specialist Regular control of expansion tank by a specialist Regular control of pellet feeding devices automatic ignition devices and feeding features Ple...

Страница 6: ...stand some of the terminology used to describe the systems operation Air Flow through the Biomass heating system 1 Fuel is fed from the fuel store via an auger The fuel is poured from the top into the...

Страница 7: ...out 80 85 C 3 The fluid flows past an aquastat water thermostat that regulates the burn rate of the heating system in conjunction with the flue gas temperature sensor that measure the temperature in t...

Страница 8: ...8 P a g e SPECIFICATIONS Propel 25 Propel 40...

Страница 9: ...9 P a g e FOR PROPEL 25 FOR PROPEL 40 AIR ELIMINATOR VALVE BLOW OFF AIR ELIMINATOR VALVE BLOW OFF...

Страница 10: ...ressure bar 3 3 Test Pressure 4 3 4 3 Max Suction Flow Rate Of Flue m h 60 100 Exhaust Fan sucktion pressure at full load pascal 7 10 Dimensions Total Weight kg 420 480 Water Content lt 65 127 Bunker...

Страница 11: ...es all draw air from the room Be certain there is an adequate source of fresh air ventilation to offset these demands or you may create negative pressure in the room and prevent the heating system of...

Страница 12: ...the chimney and determined it is suitable for use with a residential heating appliance that burns solid fuel 2 The chimney or flue should be at least 3 4 m tall and sized correctly for the Kozlusan He...

Страница 13: ...13 P a g e This page intentionally left blank...

Страница 14: ...OT throw fuel into the burnpot via the access door 8 Keep the access door closed tight except when tending the burnpot 9 Keep the heating system area clear of combustible materials gasoline and other...

Страница 15: ...relief valve at least once a year 5 Check the water pressure is between 1 and 2 bar if too low top up system with more water 6 DO NOT clean heating system surfaces when the unit is hot Wait until the...

Страница 16: ...nd to let the boiler cool down for at least 6 8 hours later switching off the system before proceeding with these works Yearly Maintenance Cleaning Heat exchanger and baffles Remove outer body cover a...

Страница 17: ...est the intervals of the sensors grate motor separator Lubrication of the heat exchanger cleaning drive and grate bar Exhaust gas measurement Maintenance every 3 years Maintenance volume from the year...

Страница 18: ...tive temperature sensor Inform customer service Error Back burning to auger The temperature of the augerexceeded the limit thermostat s value Back burning to auger Defective back burning detection the...

Страница 19: ...w to heat up The boiler is on utility water operation mode Change operating mode Hydraulic problem Contact installer Altered heating curve Adjust Heating circuit pump is defect Inform customer service...

Страница 20: ...20 P a g e...

Страница 21: ...21 P a g e...

Страница 22: ...22 P a g e...

Страница 23: ...23 P a g e...

Страница 24: ...24 P a g e...

Страница 25: ...25 P a g e...

Отзывы: