![Koyoe KY-EST06KH Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/koyoe/ky-est06kh/ky-est06kh_user-manual_1999590020.webp)
20
Warning Label
DANGER!
Improper handling can be a danger of electric shock.
Do not open the shell at any time. Opening the shell without
authorization will not continue to enjoy the warranty.
Warning!
Inverter operation is prohibited improper operation.
- Do not pull out PV connectors, AC connectors and battery
connectors when the inverter is running.
- When turning off the inverter, all power supplies of the inverter,
including PV, grid and batteries, must be turned off and wait 10
minutes before operating the inverter.
- Before pulling out any connectors, you must ensure that the
connectors have no voltage or current.
Warning!
After completion of installation, all safety instructions, warning
labels and nameplates on the inverter must meet the following
conditions:
-Must be clearly legible.
-Should not be removed or covered.
Warning!
Risk of burns due to hot components .
-Do not touch any hot parts (such as heat sinks) during operation.
-Only the LCD panel and the DC switch can safely be touched at
any time.
Warning!
- Only professionals can change the type Settings of safety
regulations.
- Unauthorized changes to safety regulations lead to damage of
the inverter will not enjoy warranty service.
- Please be aware of the risk of static electricity from damaging the
inverter.
- Do not disassemble the inverter and contact the internal devices.
- Connectors that contact the inverter directly while the inverter is
running are prohibited.
Содержание KY-EST06KH
Страница 1: ...1 User Manual 3 Phase Hybrid Inverter KY EST06KH KY EST20KH V1 0...
Страница 10: ...10 Dimensions KY EST06 10KH unit mm Dimensions KY EST12 20KH unit mm...
Страница 12: ...12 Fig1 5 Three phase Meter Dimension unit mm...
Страница 15: ...15 Each successive press of the button selects a new parameter...
Страница 16: ...16 Each successive press of the button selects a new parameter...
Страница 17: ...17 Each successive press of the button selects a new parameter...
Страница 32: ...32 View the power quality response mode...
Страница 34: ...34 Figure 5 2 2...
Страница 48: ...48 Neutral line of alternative supply must be disconnected after the grid is off applies to other counties...
Страница 68: ...68...
Страница 70: ...70 Figure...
Страница 73: ...73 Fig 9 1 LCD operating figure...