![Koyoe KY-EST06KH Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/koyoe/ky-est06kh/ky-est06kh_user-manual_1999590019.webp)
19
Please comply with the relevant regulations of power grid.
2.3. Battery
Please use the battery recommended by our company and pay attention to the following
:
2.4. Inverter
Be careful!
- All electrical connections must comply with local and national
standards.
-Only with the permission of the utility grid, the inverter can be
connected to the utility grid.
DANGER!
- A short circuit or incorrect installation of a battery can release
energy and may result in a combustion or fire hazard.
- There may be fatal voltage in the battery terminals and cables
of the inverter. Contact with the cables and terminals in the
inverter may cause serious personal injury or even death.
Warning!
Provide sufficient ventilation for the battery system to prevent
flames and sparks from the explosive hydrogen gas that the
batteries release.
Due to the dangers of hydrogen gas and battery electrolyte:
-locate batteries in a designated area, complying with the local
regulations.
-protect the enclosure against destruction.
-do not open or deform the battery.
-whenever working on the battery, wear suitable personal
protective equipment (PPE) such as rubber gloves, rubber
boots and goggles.
-rinse acid splashes thoroughly with clear water for a long time
and consider consulting a doctor.
Warning!
-Improper settings or maintenance can permanently damage
the battery.
-Incorrect inverter parameters will lead to the premature aging
of battery.
Содержание KY-EST06KH
Страница 1: ...1 User Manual 3 Phase Hybrid Inverter KY EST06KH KY EST20KH V1 0...
Страница 10: ...10 Dimensions KY EST06 10KH unit mm Dimensions KY EST12 20KH unit mm...
Страница 12: ...12 Fig1 5 Three phase Meter Dimension unit mm...
Страница 15: ...15 Each successive press of the button selects a new parameter...
Страница 16: ...16 Each successive press of the button selects a new parameter...
Страница 17: ...17 Each successive press of the button selects a new parameter...
Страница 32: ...32 View the power quality response mode...
Страница 34: ...34 Figure 5 2 2...
Страница 48: ...48 Neutral line of alternative supply must be disconnected after the grid is off applies to other counties...
Страница 68: ...68...
Страница 70: ...70 Figure...
Страница 73: ...73 Fig 9 1 LCD operating figure...