![Korenix JetLink 1102 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/korenix/jetlink-1102/jetlink-1102_user-manual_1997720018.webp)
JetLink 1102/
JetLink 1302 User Manual
18
2
Fieldbus Gateway Installation
2.1
INSTALLATION GUIDELINES
The following guidelines are provided to optimize the device performance. Review the
guidelines before installing the device.
Make sure cabling is away from sources of electrical noise. Radios, power lines,
and fluorescent lighting fixtures can interference with the device performance.
Make sure the cabling is positioned away from equipment that can damage the
cables.
Operating environment is within the ranges listed range, see
“Specifications” on
page 10.
Relative humidity around the fieldbus gateway does not exceed 95 percent
(noncondensing).
Altitude at the installation site is not higher than 10,000 feet.
In 10/100 and 10/100/1000 fixed port devices, the cable length from the fieldbus
gateway to connected devices cannot exceed 100 meters (328 feet).
Make sure airflow around the fieldbus gateway and respective vents is unre-
stricted. Without proper airflow the fieldbus gateway can overheat. To prevent
performance degradation and damage to the fieldbus gateway, make sure there
is clearance at the top and bottom and around the exhaust vents.
2.1.1
Connecting Hardware
In this instruction, it will explain how to find a proper location for your Fieldbus Gate-
ways, and how to connect to the network, hock up the power cable, and connect to
the JetLink Seies.
2.2
VERIFYING FIELDBUS GATEWAY OPERATION
Before installing the device in a rack or on a wall, power on the fieldbus gateway to
verify that the fieldbus gateway passes the power-on self-test (POST). To connect the
cabling to the power source see “Power Supply Installation” on page 28
At startup (POST), the System LED blinks green, while the remaining LEDs are a
solidy green. Once the fieldbus gateway passes POST self-test, the System LED
turns green. The other LEDs turn off and return to their operating status. If the field-
bus gateway fails POST, the System LED fieldbus gateways to an amber state.
After a successful self-test, power down the fieldbus gateway and disconnect the
power cabling.
Содержание JetLink 1102
Страница 10: ...JetLink 1102 JetLink 1302 User Manual 10 1 Product Overview 1 1 SPECIFICATIONS...
Страница 13: ...JetLink 1102 JetLink 1302 User Manual 13 1 2 2 Rear View Figure 1 4 Rear View...
Страница 17: ...JetLink 1102 JetLink 1302 User Manual 17 1 3 DIMENSIONS Figure 1 7 Dimensions JetLink1102 1302...
Страница 24: ...JetLink 1102 JetLink 1302 User Manual 24...
Страница 47: ...JetLink 1102 JetLink 1302 User Manual 47...