Diesel power plants can be installed in a specially equipped place both indoors and outdoors.
For any method of location, it is necessary to provide:
- grounding of the power plant;
- normal, unhindered flow of incoming air and appropriate removal of carbon monoxide. In any case, do
not block the air intake and exhaust, as this has a serious impact on power plant operation (See Figure 2)
Determine if the engine will run indoors. Do not allow the power plant to operate in a room where flam
-
mable gases may be drawn into the air intake system.
Fig. 2
Never cover the openings of the fence or drain air that
passes through the electrical protective cover of the pow-
er plant.
IMPORTANT!
1.
Fresh air intake hole on the side of the power
plant.
2.
Fresh air intake holes on the casing door.
3.
Hot air outlet opening.
Distance to the
wall at least 1
meter
Distance to the ceiling at least 2 meters
Distance to the
wall at least 2
meters
POWER PLANT VENTILATION GRILLES
POWER PLANT VENTILATION GRILLES
1
1
2
2
3
3
1
1
EARTHING BOLT
EARTHING BOLT
When putting a power plant into operation, an obligatory prerequisite is its grounding. Grounding is the
possible protection against electric shock in case of emergency.
Regarding the correct equipment of the ground loop be sure to consult with a certified electrician or an
authorized dealer.
Power plant grounding is not a guaranteed protection
against electric shock!
WARNING!
INDOOR POWER PLANT PLACEMENT CONDITIONS
2.1
FOUNDATION AND VIBRATION ISOLATION:
FOUNDATION AND VIBRATION ISOLATION:
1. When installing a diesel power plant indoors, check the relevant building codes for the building structure
and its foundation regarding the possibility of such installation. They must withstand the total weight of
the power plant, the weight of additional equipment and fuel reserves, as well as withstand the load that
occurs during the plant operation.
2.Premise floor must be prepared accordingly, smooth, withstand the total load and have anti-vibration
properties.
3. If moisture can enter the room where the power plant will be built, a reinforced concrete foundation
should be equipped at a level higher than the floor, the height of which should exceed the possible level
of flooding.
Содержание HEAVY DUTY KS 18-1DE-G
Страница 2: ...koenner soehnen com 1 DEUTSCH 2 22 POLSKI 44 66 ENGLISH 23 43 67 87...
Страница 68: ...KS 18 1XM KS 18 1YE KS 18 1DE G KS 25 3LM KS 33 3XM KS 33 3YE KS 33 3DE G UA...
Страница 71: ...konner sohnen com 70 1 2 1 3 1 2 2 3 4 5 1 1 5 5 2 2 6 6 3 3 7 7 4 4 8 8 6 7 8 1...
Страница 72: ...konner sohnen com 71 2 2 2 1 2 3 1 2 2 1 1 2 2 3 3 1 1 C...
Страница 73: ...konner sohnen com 72 2 2 300 400 200 200 2 2 30 20 2 1 1 2 3...
Страница 77: ...konner sohnen com 76 5 OFF 1 2 3 4 5 7 8 9 10 OFF 2 3 2 3...
Страница 81: ...konner sohnen com 80 1 6 7 2 5 10 3 4 5 AVR 5 1 2 3 10 4 10...
Страница 82: ...konner sohnen com 81 1 1 2 3 3 STOP 4 9 www konner sohnen com 47 096 967 43 31 095 539 95 37 093 100 06 47...
Страница 84: ...konner sohnen com 83 12 200 1 2 3 4 K nner S hnen www koenner soehnen com 4 13 4 6 1 2 4 5 3 4 13 4 11 250 100...
Страница 85: ...konner sohnen com 84 200 1 2 3 4 5 6 13 K nner S hnen 12 30 12 8 14 15...
Страница 86: ...konner sohnen com 85 1 2 OFF 3 4 0 20 1 2 3 4 5 6 7 1 12 12 24 24 2 3 4 AC 5 6...
Страница 87: ...konner sohnen com 86 1 2 3 4 6 1 2 3 1 2 3 1 2 AC 1 OFF 2 3 4 AVR AC 5...
Страница 88: ...konner sohnen com 87 16 K nner S hnen www koenner soehnen com ON 1 2 FCS START 1 5 2 OFF 3 FCS 2 80...
Страница 89: ......